Need primavera işler
I have 7 STRUCTURE design Projects. I need an expert in SAP2000 or an expert in STAAD-Pro. The projects are simple. I have to help scholars to write 15 Review and Research papers. I will be guiding the workflow. I need someone who can provide Plagiarism Free work. I would pay in Indian currency. There would be a constant flow of work. I have 7 Construction and Technology Management projects. I need civil engineers who are familiar with MS Project and Primavera. There would be a demand to write 15 papers also. The details would be discussed in the chatbox. Please attach your previous work with the proposals. You would enjoy working with me. Please Only those who have time and expertise need to bid. Happy Bidding PS: Please check the work_plan attached a...
a excel sheet having the data of maintenance schedule is provided. Based on this sheet, prepare a programme in is 5000 INR
I have an environment at home and I would like to configure couple of things as package and those are; - Integrating Power BI to Primavera P6 OR EPPM - Integrating Oracle BI to EPPM or P6 - Installing Oracle Primavera Analytics - Installing ORACLE UNIVERSAL CONTENT MANAGEMENT UCM on my machine and integrating it with EPPM Please read the requirements above and make sure you know the above 4 things. Thank you
looking for a software which call Oracle Primavera Prime, who could provide it and install it for me. thanks alot
I have an environment at home and I would like to configure couple of things as package and those are; - Connecting Power BI to Primavera P6 OR EPPM. - Connecting Oracle BI to EPPM. - Installing Primavera Prime on my PC. - Need to know the database tables responsible for documents where are these stored inside Unifier. - Installing Oracle Primavera Analytics. - Installing ORACLE UNIVERSAL CONTENT MANAGEMENT UCM on my machine and integrating it with EPPM. Please note that I have Oracle Unifier system is installed, EPPM is installed, OBIEE is installed on my local PC.
Dear All, I'm on stage where I have studied Oracle Primavera Unifier, so I'm looking for a guidance and someone who really could provide me a proposal work to do for exercise for me to achieve which I could provide it in my last study final project which I have to provide a full system that cover the whole construction life cycle to control the project including the cost module as well. So the help will be only on providing the proposal requirements and I will work on creating the whole Business Processes and the freelancer will guide me for the implementation and what I need to work on.
Need to work on adding resources , cost loading and creating histograms . Have 3 hours of time .
I have a problem with Printing the schedule activities in PDF with Primavera EPPM. I have did a lot of research and I struggled with that. who could really provide the solution you are very welcome. Thanks.
I'm looking for someone who could install for me Oracle Primavera Analytics and integrate Oracle BI with Primavera EPPM. Note: I have already installed Oracle BI and EPPM on my desktop so only here I need integrating.
I'm looking for someone who really could teach me Primavera Unifier for a full implementation, as I have taking a course last semester in my college but I need someone who really could teach me as well the Business Process, how to do the forms and type of forms as well and better to be in the terms of construction . I'm going to apply this job for around 150 hours to 200 hours.
I need Primavera time schedule level 3 , the project is not complicated, it is a design, construction , and operation of Construction and Demolition Waste Facility, i need a time schedule for the construction period which is 8 months (max) i can send the expected activities and recommended duration, so, you can prepare a professional PM6 time schedule attached an excel sheet just to get an idea about the items.
We are searching for a planner with experience in specialist fit out or theming projects using Primavera scheduling software. We are especially interested in a service to develop a tender schedule into a detailed schedule post award programme with cost and resource loading. The works include themed facades and rock work which are in-situ fabricated so a knowledge of both off site and on site fabrication. The work will be hourly paid so quotations should include any costs for per hour for working off site but conducting out of hours conference calls as the project team is based in UAE.
I have a project which needs to be created using 1- Microsoft Project 2- Primavera or P6 - I need to implement a 14 Points assessment that was described by the DCMA. - I need to create a critical path analysis - I need to create EVMS - SPI and CPI Project must be finished within ONEDAY.
1. Based on the information given develop a network diagram using Activity on Node (AON) method. 2. Calculate the ES, EF, LS, LF for each activity on the diagram? 3. What is the critical path of the project? 4. List all the project activities in a table including the ES, LS, EF, LF, FF, TF as a number? 5. List all the project activities in a table including their dates of ES, LS, EF, LF? 6. Draw the Gantt chart for all the activities by Microsoft Excel using date and another Gantt chart using numbers? 7. What is the total project duration? 8. What is the project completion date? In the project; Activity, Duration (days), Predecessor, working day and other details will be provided.
Rough material estimate . and Excel file of material alongwith primavera schedule.
Primavera P6 Trainer required to train students from 6PM to 8PM for one month Location : Vidyaranyapura Bangalore Requirement : Immediate within a weeks time
The project goes in file it runs under the software primavera portugal and i need to fix it
I need a Power BI Dashboard for construction project , such Dashboard should be relying on Primavera Template that to be handed over with the Dashboard , however I can provide the primavera file in case you don't have an XER template to build based on
6 months contract in GCC- visa, airfare, transportation and accommodation covered. Azure, Power BI Principal Consultant 5-8 Years Experience informatica IICS SQL Analysis Services Data Engineering Data Warehousing MS Azure Analysis Services Power BI MS Data Factory Oracle EBS Finance Procurement HR Primavera Cortana
Exhibit 1 shows that 4 of the project activities have a duration of 12 days. Exhibit 2 shows that there are 8 hours in a work day. Exhibit 3 is the exported .xer file. Exhibit 4 shows that when the .xer file is exported the number of hours for the 12 day duration is 95 and not 96 whereas all the other durations are a multiple of 8. Exhibit 5 confirms that clndr_id 178 is the “Corporate – Standard Full Time” calendar. If you know the reason and solution for the above problem please would you let me to how much you would charge for enlightening me.
I'm looking for freelancer who can configure Oracle system. The candidate should manage the following skills: Oracle Database Oracle Primavera Oracle EBS Tech Integration Oracle Hyperion Oracle OBIA Oracle Retail Oracle OBIEE If you consider you have these skills or worked with Oracle before, place your bid. We can discuss details over chat.
We are constructing two toilets in a commercial building and we need to submit a baseline program prepared in Primavera P6. This is a very small project. This is just for the monitoring purpose. So, simple activity loaded critical path method program will be sufficient.
doc otd, plan items otd , cp otd, back log hours I want to report project weekly trends (on time delivery kpis): Documents otd Control points otd Plan items otd I also want to incorporate remaining hours left on project weekly. And the no of resources on project weekly I need this dashboard to help me in monitoring project trends and planning, alongside the primavera p6 I use. It would be ideal if you also have p6 knowledge
I need online trainers for my online project. Who hase experienced in PRIMAVERA, AutoCAD, 3DS Max, Revit Architecture, Ms. office, Graphic design, web designers please contact immediately. South Indian preferred.
time schedule for construction project loaded with cost loaded with resources (manpower & equipment) tools (primavera software)
I want a help in these programs(Primavera p6, Microsoft project, asta power project) for resource leveling problem ,So I want you to write only the steps of these 3 programs for resource leveling problem? By looking at these steps, I want to inter data without any errors.
Planning project and scheduling using ms project 2013 and p6 primavera 16.5 . Putting plan
Hi msamak, I noticed your profile and would like to offer you my project. We need one day training for 2 employees at our office in next week at our company which is located in Al Messila. If you provide training for MS Project kindly do send me your proposal & availability in next between 4 Jan to 10 Jan, when you can come and train the attendees. Attendees are previously using primavera p6 for project management.
Procuro developer para concluir um projeto, que tem como objetivo gerir aluguer de espaços. Nesta fase precisamos concluir os formulários de pesquisa em Wordpress, e interligar com o Primavera Software. Será preciso também disponibilizar informação que vem do Primavera numa área (My Account). Disponível para fornecer mais elementos em privado, para apresentação de orçamento.
Lütfen detayları görmek için Kaydolun ya da Giriş Yapın.
Current project is to take a primavera P6 schedule data that has a group of 23 risks and the applicable risk exposure and visualizes the risk in either heat map. Intent of dashboard is to * Be able to see portfolio risk exposure in hours and at what time from a single project location to a series of projects ( same risks, different locations * be able to display risk intelligently so the business can understand what they should be focusing on Existing data set will be supplied in excel and manual data upload is all that is required at this stage.
Need Civil enginners (Students/ Interns/ professionals) to contribute DIY Projects for our website Projects on below tools are accepted. Management 1. MS Project 2. Primavera 3. Project Kick Start 4. Smarta Analysis/Design 1. Staad Pro 2. GTS 3. STRAP 4. Sap 2000 5. Struds 6. ETABS 7. NISA 8. GT Strudl 9. Xsteel 10. MicroStation 11. Ansys Modelling 1. ArchiCAD 2. AutoCAD Rivet 3. D Studio MAx 4. PDS 5. PDMS 6. SP 3D 7. Tekla Structures 8. Photoshop Water tanks 1. ESR GSR Quantity & Estimation 1. QE PRO Geotechnical 1. Plaxis 2. Geo GPS/GIS 1. Arc View 2. GeoMatics Sewer modeling 1. Kanal ++ Water distribution network 1. Aqua ++ Highway 1. MXRoad 2. HDM 3. AutoPlotter 4. Heads Green buildings 1. Ecotect 2. Visual Doe 3. Ene...
If you are planning engineer or time frame programmer who is familiar with planning I have a list of activities which needs to be linked by the schedule either by Microsoft program or Primavera P3 or P6 . I need to see relevant work from you before award .
Iam civil engineer designed a lot of project in Egypt, Saudi Arabia, Dubai with various systems by Aci, Saudi code, Egyptian code,. By Autocad, sap, Etabs And I have back ground about Primavera and designed time schaduale for some projects in dubai I will be very happy if I work with you
Looking for Primavera Unifier developer. for hands on training on oracle primavera unifier web service integration(SOAP,REST & Java code) . This above requirement is only for Primavera Unifier expert/administrator
I need a planning who can guide and consult me to finalise a project plan, I've done most of it but the consultant sent 25 notes, so we have to finish it one by one in this weekend and send it at the end of Saturday, I'm using Primavera I've all documents need The project is just a boundary wall 70000 m2 and Asphat, and some other Electromechanical Items.
Boa tarde, Utilizo frequentemente o ERP Primavera em conjunto com o Excel no trabalho. No Primavera temos bastantes "projectos" individuais cada um com clientes e fornecedores cujo os dados são actualizados diariamente pela nossa equipa. No entanto caso, se pretender saber o saldo de tesouraria, exemplo saldo Extrato Conta ou Lista de Documentos Pendentes, de cada cliente e fornecedor tenho de percorrer cada um dos projectos um a um e isso demora demasiado tempo. O que pretendo é uma folha de excel base "leve" onde possa introduzir o meu nome de utilizador, password e protejo e que me recolha o saldo de tesouraria bem como documentos pendentes na tesouraria de clientes e fornecedores desse mesmo protejo. O objectivo será eu replicar...
Boas, tudo bem? Utilizo frequentemente o ERP Primavera em conjunto com o Excel no trabalho. No Primavera temos bastantes "projectos" individuais cada um com clientes e fornecedores cujo os dados são actualizados diariamente pela nossa equipa. No entanto caso, pretenda saber o saldo de tesouraria, exemplo saldo Extracto Conta ou Lista de Documentos Pendentes, de cada cliente e fornecedor tenho de percorrer cada um dos projectos um a um e isso demora demasiado tempo. O que pretendo é uma folha de excel "leve" base onde possa introduzir o meu nome de utilizador, password e protejo e me recolha o saldo de tesouraria e documentos pendentes na tesouraria de clientes e fornecedores desse mesmo protejo. O objectivo será eu replicar essa &quo...
Boas, tudo bem? Utilizo frequentemente o ERP Primavera em conjunto com o Excel no trabalho. No Primavera temos bastantes "projectos" individuais cada um com clientes e fornecedores cujo os dados são actualizados diariamente pela nossa equipa. No entanto caso, pretenda saber o saldo de tesouraria, exemplo saldo Extracto Conta ou Lista de Documentos Pendentes, de cada cliente e fornecedor tenho de percorrer cada um dos projectos um a um e isso demora demasiado tempo. O que pretendo é uma folha de excel "leve" base onde possa introduzir o meu nome de utilizador, password e protejo e me recolha o saldo de tesouraria e documentos pendentes na tesouraria de clientes e fornecedores desse mesmo protejo. O objectivo será eu replicar essa &quo...
Boas, tudo bem? Utilizo frequentemente o ERP Primavera em conjunto com o Excel no trabalho. No Primavera temos bastantes "projectos" individuais cada um com clientes e fornecedores cujo os dados são actualizados diariamente pela nossa equipa. No entanto caso, pretenda saber o saldo de tesouraria, exemplo saldo Extracto Conta ou Lista de Documentos Pendentes, de cada cliente e fornecedor tenho de percorrer cada um dos projectos um a um e isso demora demasiado tempo. O que pretendo é uma folha de excel "leve" base onde possa introduzir o meu nome de utilizador, password e protejo e me recolha o saldo de tesouraria e documentos pendentes na tesouraria de clientes e fornecedores desse mesmo protejo. O objectivo será eu replicar essa &quo...
We would like to engage with a freelance project planner whom is conversant with Primavera, Microsoft project or similar, on an ongoing basis to produce initial construction programme for tenders, projects and periodic updates.
I need to update and Modify a Project Schedule on Primavera. The Schedule is already existing and I just need to Update the dates and add / delete some activities
We have an urgent job to prepare a small schedule in Primavera, the data is already in PDF. Also, there are minor changes to be made in the Schedule as well.
My client requires that I prepare the attached schedule on Primavera P6, I will need the file and some pictures of the schedule that I can include in a presentation. This should be an easy quick job. Regards, A
I require: 1- preliminary Primavera "P6" Schedule (only preliminary based on the attached bill of quantities) 2- Organzational chart (attached but needs to be re-done in presentable way) 3- Outline HS&E plan (standard for construction projects) 4- QA/QC credentials. (standard for construction projects) Should be easy job as the required schedule is preliminary not full details, other documents are standard and should be ready as it's used in any construction project.. My budget is 100$ and required within 2 days
i encountered an error when opening a project
Required some one with Primavera skills to create premilinary program/time schedule to be submitted with tender documents, also required some standard documents to be prepared for submission.. Attache the bill of quantities for the projects (the same main activities can be used to create the primavera time schedule), you are required to estimate durations for each item in your schedule but the total project duration must be 730 Days (2 years from start) Required submitting from you: 1- Preliminary programme using Primavera showing design (if any), engineering, procurement and shipping, main construction activities, testing and commissioning, key dates, milestones, sectional completion dates and time for completion. 2- Staff organization chart showing head office su...