WWTP HCMI PROJECT Capacity : 1 m3/Hour

Kapalı İlan edilme: 2 yıl önce Teslim sırasında ödenir
Kapalı Teslim sırasında ödenir

We built a wastewater treatment plant to reduce the heavy metal content in electroplating waste

2D Drafting 3D Drafting

Proje NO: #32264603

Proje hakkında

3 teklif Uzak proje Aktif 2 yıl önce

Bu iş için 3 freelancer ortalamada $50 teklif veriyor

azraazeen9

Hello, i am ready exited to work you as i read your job description I am also an expert in making 2d,3d modelling and animating characters 2dautocad drawing ,elevation, solid work, Revit ,FBX ,Unity, Render also interi Daha Fazla

$85 USD in 3 gün içinde
(0 Değerlendirme)
0.0
artqueen47

Hi, I want to start it now so please come to chat and start it soon Hope you will be doing well!! It's not a big for me to do ________WWTP HCMI PROJECT Capacity : 1 m3/Hour ___________________________ I'm interesting Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0