Devam Ediyor

Simple Project Management Assignment

This is the project details, ALL steps must be followed correctly.

Parts 1-4 are done and will be sent to you once accepted.

1. Create a Project Scenario

2. Develop a Project Charter

3. Design WBS with about 5 to 6 work packages and create WBS dictionary for any 2

activities in each work package created ( minimum 10 WBS dictionaries)

4. Provide and present the deliverables mentioned in point 5 to 18 mentioned below

Below are the steps that i'll need you to help me complete:

5. Create about 30 to 40 activities and their interdependency for the entire project

6. Create PERT table for all activities identified (show working) with o, m, p, tE, Ϭ, andϬ2

7. Hand-drawn AON Network Diagram (show EST,EFT, LST, LFT, FF & TF) ( Take a picture and send this to me)

8. Indicate the critical path or paths, non-critical paths

9. Create Organization chart for the project including all project team members

10. Construct a Matrix- based chart “Responsibility, Accountability, Consult and

Inform“(RACI) for any five activities identified in point 5. above for the human

resources used in the project team shown in the organization chart in point 9.

11. Create MS Project Gantt Chart (show S-S, F-S, F-F, recurring tasks, split task, Lead &

Lag)

12. Create M/S Project Schedule View

13. Create M/S Calendar for all human resources, min 3 calendars

14. Create M/S Project Resource sheet with Rate Table

15. Create M/S Project Cost View with total cost, baseline and variances. Demonstrate

fixed costs, fixed cost accrual with split view of details view of task form for activities

16. Conclusion

a. State Project Duration,

b. Critical Path/Paths & Non-critical Path/Paths,

c. Total Project Cost, baseline cost and variance. Comment on the project cost

derived and the budget given( baseline)

d. Completion project duration ranges for standard deviation of 1 sigma, 2 sigma

and 3 sigma,

e. Summarize Project & Learning and state your suggestions to improve the

planning of the assigned project with the limitations and constraints given in

the scenario

All these need to be done by 22/7/2017

Beceriler: Proje Yönetimi, Proje Takvimlendirme

Daha fazlasını görün: library management system project simple, simple library management project using, project management project plan assignment, library management project simple, library management system simple project, simple library management project, simple school management project java, simple contact management project html, assignment writing project management, assignment paper project management, project simple examination management system visual basic, hospitality management project crystal report simple vb6, simple aspnet library management project, simple online hotel management project php

Proje NO: #14671911

Seçilen:

RPaul73

Experienced freelancer with 10+ years of project management experience. Relevant Skills and Experience Project Management, Project Planning and scheduling, Microsoft Project Proposed Milestones $50 SGD - M1 $5 Daha fazlası

5 gün içinde 150$ SGD
(1 Değerlendirme)
3.2

10 freelancer bu iş için ortalamada 156$ teklif veriyor

in 3 gün içinde155$ SGD
(4 Değerlendirme)
3.6
1 gün içinde 100$ SGD
(9 Değerlendirme)
3.5
in 3 gün içinde211$ SGD
(2 Değerlendirme)
1.8
in 3 gün içinde111$ SGD
(1 Değerlendirme)
1.6
YourDeskmate

Hey, I am very much interested in working on your project. I have read the given instruction and will be able to deliver the best . Contact me via chat i for us to proceed

in 3 gün içinde200$ SGD
(1 Değerlendirme)
2.4
in 3 gün içinde222$ SGD
(0 Değerlendirme)
0.0
in 3 gün içinde31$ SGD
(0 Değerlendirme)
1.3
ameerafelesteen

Hi I am an industrial engineer and have knowledge and experience in project management I would like to do the project for you Please feel free to contact me for further details

in 3 gün içinde220$ SGD
(0 Değerlendirme)
0.0
in 3 gün içinde155$ SGD
(0 Değerlendirme)
0.0