Estimating for Industrial construction projects
$250-750 CAD
Teslim sırasında ödenir
We require estimators to cost out a new construction project. Preliminary concept drawings issued for take offs and quantity surveys. Files to be uploaded as they are created.
Proje NO: #15362874
Proje hakkında
Bu iş için 23 freelancer ortalamada $443 teklif veriyor
Hi. I have 11 yrs experience in Estimating and costing. I am expertise in blue beam and Planswift. let me know more about the project details with drawings. Relevant Skills and Experience Hi. I have 11 yrs experience Daha Fazla
hello sir, i'm a civil&structural engineer and i have done projects like this before,as ur project related to my field and just check with me inbox to discuss more details. Thank you Relevant Skills and Experience Au Daha Fazla
Dear Client. I am an Architect and have over 10 years experience in designing buildings and Interiors as well as any form of Graphic Designing Please note that I have all the knowledge and skill to take up and comple Daha Fazla
Hi, the bid amount is not final, kindly don't award the project to us before discussion on chat because plan is not given, the bid can be lowered too if the project is not too big. Relevant Skills and Experience With Daha Fazla
I can provide you the estimations and all take off you need if you like i can provide you more than what you need. Stay tuned, I'm still working on this proposal.
I am a 15 years experienced civil and structural engineer. Has worked with Technip, Chicago Bridge & Iron. Relevant Skills and Experience Civil and Structural Engineer, Architecture, Building and Industrial Design, Ca Daha Fazla
I have over 20 years of construction experience in coordination, project management and Estimation. Relevant Skills and Experience Experieced in pricing with quantity takeoffs Proposed Milestones $777 CAD - full esti Daha Fazla
I have many industrial and Domestic buildings estimates and have an experience of 15 years in this field.
Based on the plan and cross section drawings of the project I will Calculate each quantity. Considering the current market rates I will then calculate the cost of each item and eventually he cost of the project. I will Daha Fazla