
In Progress
Posted
Paid on delivery
I have an EagleView report for a college dormitory re-roof and need a concise material take-off pulled from those measurements. The existing assembly is 60-mil EPDM over two layers of tapered polystyrene on a concrete deck; we are replacing it with a fully adhered system made up of: 60-mil TPO, ½-inch coverboard, a fully adhered tapered ISO package, an additional 1-inch ISO layer, and TPO-clad edge metal. Your job is to translate the EagleView data into exact quantities for the following items I checked: • 60-mil TPO membrane (include field, flashings, and 10 % waste) • ½-inch coverboard (fully adhered) • ISO insulation – both the flat 1-inch layer and the tapered package, laid out by slope section • Adhesive amounts for the fully adhered components • TPO-clad edge metal, broken down by linear footage and standard stock lengths Please return a clear spreadsheet (Excel or Google Sheets) that shows: roof area references from EagleView, calculated square footage or linear footage, waste factors, and a final summary table. No pricing is needed—just counts and quantities. If something in the report appears ambiguous, flag it in a notes column so we can review together. Accuracy is critical; the college uses these numbers for purchase orders. Let me know your timeframe and any clarification you need once you have the EagleView file.
Project ID: 40276524
Active 2 mos ago
Location: United States
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

Lees Summit, United States
Payment method verified
Member since Mar 4, 2026
£20-250 GBP
$750-1500 USD
$250-750 CAD
$250-750 USD
$250-750 USD
$250-750 USD
$30-250 USD
₹1500-12500 INR
$250-750 USD
$250-750 USD
€250-750 EUR
$30-250 AUD
₹750-1250 INR / hour
$250-750 USD
$20000-50000 CAD
₹3000-5000 INR
₹600-1500 INR
£3000-5000 GBP
$25-50 AUD / hour
$750-1500 USD