Verildi

J2EE, Java Job by meganayak

I need to show a host failure in a data center.

What i need to show is presently in a datcenter there are 4-5 hosts executing the [url removed, login to view] if one host fails which is executing say 5 jobs...I have to switch over those from the failed host to the back up host which is made to run on the failure of one host.

This will affect the time taken without failure and with failure.

I want to draw the difference between the two and show it.

Can u help me with the code for the above

Beceriler: J2EE, Java

Daha fazlasını görün: draw jobs, 7 11 jobs, data center jobs, switch project, apr code, failed project, difference jobs, project short time job, business analyst project full time basis india, setup deployment project give time, custom time control, awstats time taken, deployment project custom license number, dotproject project custom sort, project completion time table

İşveren Hakkında:
( 0 değerlendirme ) panjim, India

Proje NO: #4419991

1 freelancer bu iş için ortalamada 200₹ teklif veriyor

IMSeriousBidder

Hired by the Employer

200₹ INR / saat
(62 Değerlendirme)
6.7