Devam Ediyor

MRP and Earned Value

One data file is from a SAP system and updated weekly. The second file/sheet is a base file that will not change but needs to be compared to current data. Finally, the third file/sheet is the schedule.

The project always begins with the second file to create a baseline budget. The schedule is then created based on previous delivery of material from the baseline. The third file updated weekly need to be ingested into the file to compare what was originally in the baseline for cost and schedule. This also has to identify additions/differences from baseline to the current weekly file. Some lines will have duplicate material but may be assigned to a separate account and/or the same. It the same, the quantity and cost need to be summed.

The material is summed into a kit or module and needs to be added together so that the sheet shows progress to complete.

The data needs to be available on a dashboard tab that reflects earned value data and graphs for each account or work package.

This is a material resource plan and earned value together into one file. The weekly file will be updated weekly in the file.

Beceriler: Veri İşleme, Excel Macros, Excel VBA

Daha fazlasını gör: booking module, differences excel files, subscribe module joomla, pmi earned value management pdf, earned value management formulas pdf, history of earned value management, earned value analysis, how to manage fixed price projects, earned value on fixed price contracts, rules of credit earned value, earned value management, zencart alertpay payment module, color value jsp, using mod rewrite create module system, module value calculator, earned value programwindows application vbnet, earned value international data standards, prestashop value discount module, EARNED VALUE, mrp module

İşveren Hakkında:
( 0 değerlendirme ) Santa Barbara, United States

Proje NO: #19310591

Seçilen:

dgled

Hi, I can prepare reports and dashboards in Excel by importing external databases from Intuit QuickBooks, (SQL, or Excel file) and manipulating the data in a structured database. During the process, Excel validates the Daha Fazla

%selectedBids___i_period_sub_7% gün içinde 200%project_currencyDetails_sign_sub_9% %project_currencyDetails_code_sub_10%
(16 Değerlendirme)
5.9

Bu iş için 8 freelancer ortalamada $157 teklif veriyor

schoudhary1553

Hello, I have gone through your job posting and become very much interested to work with you. I am an expert in this field. I have already completed several projects like this. For evidence you can see my profile. Daha Fazla

$250 USD in 4 gün içinde
(195 Değerlendirme)
7.5
polarjin2017

This is Excel /VBA result which I 've done [login to view URL] This is what i have done in Excel/VBA/MACRO. Just Crreating forms, query, Macro, custom formula, etc... I;ve done so many jobs in excel like l Daha Fazla

$150 USD in 3 gün içinde
(37 Değerlendirme)
5.7
rishabhmishra93

Hi, I am an ETL developer with wide experience in data extract and load. I have wide experience in handling very large varieties of source files which included excels and csv as well. we have certain open source tool Daha Fazla

$111 USD in 7 gün içinde
(1 Yorum)
1.1
VasilyIvoyzha

Hello, I can do this in short time (I've completed similar projects), here confirmation of my codding skills: [login to view URL]

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0
rahulsujatha03

super super cute little face and you can do it for me to come over and over again and I don't know what I want to upload like some of the African American Horror Story hotel episode of the African American Horror Story Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0
fjanzen

Industrial Engineer with 7 years of experience in Project Management/ Engineering for major Oil&Gas Projects. Advanced skills in Excel, VBA, SAP integration , Project Baseline and Budget Analysis in SAP/ MS Project/ P Daha Fazla

$222 USD in 5 gün içinde
(0 Değerlendirme)
0.0
markchristopher8

Hi, I hope all is well. I am a Certified Public Accountant here in the Philippines. I have been working as an auditor/accountant/finance analyst since 2010 (i.e., immediately after my graduation and after passing the Daha Fazla

$150 USD in 3 gün içinde
(0 Değerlendirme)
0.0