
In Progress
Posted
As Coordinator. First, the honest boundary: this is an **estimate**, not measured from the live `.kicad_pcb`/`.kicad_sch` files (I can't reach D:\ from here). It's based on the effort budget in `[login to view URL]` plus the known current state (PowerCell1 routed, open blockers). For exact numbers, see the MCP option at the end. ## Status by phase (effort-weighted) | Phase | Session | Budget (h) | Est. done | Remaining | |---|---|---|---|---| | Hierarchical schematic | 1 | 2-3 | ✅ ~100% | — | | Power Input | 2 | 1-2 | ✅ ~100% | — | | PowerCell sheet | 3 | 2-3 | ✅ ~95% | (topology verification) | | FPGA Core | 4 | 3-4 | ⚠️ ~30% | U402 real pinout/symbol | | MCU Core | 5 | 1-2 | ⚠️ ~50% | U501 full-pin symbol | | ADC + others | 6 | 2 | ⚠️ ~50% | U601/U602 symbols | | ERC + Annotation | 7 | 1 | ⚠️ ~40% | PWR_GOOD error, J702/J703 short | | Footprint assignment | 8 | 1-2 | ✅ ~90% | — | | Netlist + open PCB | 9 | 0.5 | ✅ 100% | — | | **PCB Layout** | 10 | **16-24** | ⚠️ **~20%** | 13× PowerCell repeat, center IC routing, outline, T_SENSE path, STATOR netclass | | DRC + Gerber export | 11 | 1 | ❌ 0% | all | ## Overall ratio Total budget ~30-45 h (mid ≈ 37 h). Effort-weighted: - Schematic side (~10 h): **~80% done** - PCB side (~25 h): **~20% done** → **Roughly 35% done / 65% remaining (≈ one third complete).** This matches intuition: the schematic skeleton largely stands, but the heaviest item — **PCB layout (16-24 h)** — is barely started. Only 1 of 14 PowerCells is routed, with the stackup and power planes set up. ## The two things that move this number most 1. **Topology fork (critical):** If the PowerCell in KiCad is still the OLD single-switch design, the already-routed "template" PowerCell1 has to be reworked into the 2-FET synchronous-freewheel cell → the most-complete piece becomes partly invalid and the ratio drops **below 35%**. If KiCad already holds the NEW topology, the docs just need a cheap update and **35% holds**. That's why this verification comes first. 2. **FPGA pinout bottleneck:** U402's pinout is undefined, so the **center IC routing (the bulk of Session 10) is blocked**. PCB won't progress past ~20% until the pinout is locked. --- For exact figures I can measure via MCP (Desktop session with pcb_* tools loaded): remaining ratsnest/airwire count, fraction of nets routed, live DRC/ERC error counts. Alternative: send me a current **DRC + ERC summary screenshot** and I'll revise the ratio with real numbers. Which do you prefer? details in attachment files.
Project ID: 40533827
22 proposals
Remote project
Active 21 secs ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs