Devam Ediyor

MICROCONTROLLERS AND PLCs_2

You need to submit the Sysmac studio file (smc2 file) and your report file (pdf file) Budget AUD$33,

Whether your program performs the required tasks (most important).

• How well your program is written.

• How easy to follow your ladder diagram is.

• How well your report is written and presented.

The major assignment includes two parts, a PLC program and a report:

• PLC program (80%)

• Report ( 20%)

The program needs to achieve these functionalities below:

1. Program the PLC to execute the attached Step Action Diagram.

2. When the program is first downloaded, the machine should wait for the green

button to be pressed.

3. Once the green button is pressed, the machine should start from step number 1

and then proceed through steps 2,3,4,etc.

4. Make the program cycle through repeatedly, with a 1-second pause between each

cycle.

5. If the black button is pressed and released while the machine is running, the

machine winds down to stop at the end of the cycle.

6. If the red button is pressed while the machine is running or winding down,

the machine undergoes an emergency stop at the end of the current step.

7. If the yellow button is pressed during an emergency stop, as it is released the

machine gets reset and any extended cylinders are retracted in the order:

cylinder 4,

cylinder 3,

cylinder 2,

cylinder 1.

8. After being reset or wound down as described above (in points 7 and 5), if the

green button is pressed, the machine restarts from step number 1, and behaves

as described in point 3.

9. If the green button is pressed during an emergency stop, the machine returns

to the mode it was in when the emergency stop was activated and resumes from

the step it was up to.

10. Any button or combination of buttons not assigned a function, must do

nothing if pressed.

11. If on the most recent occasion that the green button was used to start the

machine from step 1, a double click (A double click is defined as the button

being pressed twice in 0.5 seconds) was used rather than a single click; steps 6,

7, 8, 9, 10, 11 and 12 are repeated twice during every cycle.

12. This continues until the machine is next restarted from step 1, as described in

points 3 and 8.

13. During the repeating steps operation, the buttons all function as described for

regular running, as described in points 3-10.

The report should include the following features:

• A description of what your program does.

• A print-out of your ladder diagram.

• A table listing each input bit, output bit and internal relay bit, and what they

are used for.

• A step action diagram as described in the lectures. Showing:

o the PLC inputs,

o the PLC outputs,

o the essential inputs, and

o the bit details corresponding to each step.

• A mode table, as attached

Beceriler: Mühendislik, Elektronik, Mikrodenetleyici, PLC & SCADA, Elektrik Mühendisliği

Daha fazlasını gör: do you need editing and proof reading, i have 12 scanned images and each one has 30 rows and 15 column i need you will type the data from images to excel, i need someone that can take a spreadsheet that i already have and perform 2 functions, if we select you we will use your design pay the wp theme you have chosen (specify cost and platform when you submit) and you wi, if we select you we will use your design pay the wp theme you have chosen specify cost and platform when you submit and you will, three meter rear extensiondo you need an architect and engineer, if your doing marketing ncv level 2 what minimum percentage you need to obtain in order to go next level 3, need a writer will travel and write for you, what hardware and software do you need to use voip, you need more money matt manero pdf, everything you need to ace american history pdf, everything you need to ace world history pdf, 1100 words you need to know 7th edition pdf, how to start a youtube channel and what do you need, 1100 words you need to know 7th edition pdf free download, what skills and knowledge do you need to possess in order to develop a useful marketing plan?, what are databases and why do you need them?, what information and measurements would you need to calculate the rate of movement?, blockchain: the insights you need from harvard business review pdf, what you need to know about economics pdf

İşveren Hakkında:
( 652 değerlendirme ) Bangalore, India

Proje NO: #31850447

Seçilen:

Krishnakick13

I did this for you. I have a clear idea of what you need. Please give this project to me. I will made this best for you.

$3 AUD / saat tutarından itibaren
(0 Değerlendirme)
0.0