
Completed
Posted
Paid on delivery
I need a complete engineering package for a subsurface vertical barrier wall that will stop lateral migration of landfill gas beneath a site underlain by uncontrolled fill. The design must rely on a continuous geomembrane sheet system rather than concrete or steel, and every calculation, drawing, and specification has to focus on gas mitigation performance. Scope of work • Develop wall alignment, depth, and tie-in details based on the uncontrolled fill profile and anticipated gas flow paths. • Produce design calculations demonstrating impermeability, interface friction, long-term durability, and global stability. • Prepare construction drawings (DWG and PDF) including trench geometry, panel overlaps, anchor trench, venting points, and connection to existing structures. • Write a Construction Quality Assurance Plan (CQAP) that spells out material testing, panel integrity checks, seam air-pressure testing, frequency of inspections, and acceptance criteria for both installation crew and third-party inspectors. • Summarize maintenance and monitoring recommendations once the wall is in service. Acceptance criteria 1. Gas transmissivity across the wall ≤ 1 × 10⁻⁸ m²/s as proven in design calc sheet. 2. CQAP aligns with ASTM D6707, D5887, and EPA Subtitle D guidance. 3. All drawings are provided in both CAD (AutoCAD 2020 or later) and printable PDF formats. 4. Final report, drawings, and CQAP are internally cross-referenced and ready for regulatory submission. If you have direct experience designing geomembrane cutoff walls for gas mitigation and can deliver the full package on schedule, I’m ready to move forward quickly.
Project ID: 40227419
3 proposals
Remote project
Active 1 mo ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs

Hi. How are you? I already checked your description carefully and I'm happy to bid for your project. We propose to deliver a complete, regulator-ready engineering package for a geomembrane subsurface vertical gas barrier, covering alignment and depth development, gas-tight performance calculations (permeability/transmissivity, interface friction, durability, and global stability), fully coordinated CAD/PDF construction drawings, and a CQAP aligned with ASTM D6707, D5887, and EPA Subtitle D. The work will be led by a senior geotechnical/environmental engineer with direct experience in landfill gas mitigation and geomembrane cutoff systems, supported by specialists in geosynthetics QA/QC, CAD detailing, and regulatory documentation to ensure internal cross-referencing and seamless submission. We commit to an accelerated schedule with transparent methods, clear acceptance criteria, and prompt incorporation of comments so the package can move to approval and construction without delay. Will wait for your quick response. Thanks. Ihor.
$500 AUD in 7 days
0.0
0.0
3 freelancers are bidding on average $663 AUD for this job

Good Day We design geomembrane gas barrier walls with full calculations drawings and CQAP aligned to ASTM and EPA standards. Complete regulatory ready package delivered on schedule. Thanks Warm regards Future Station
$750 AUD in 3 days
0.0
0.0

Frenchs Forest, Australia
Payment method verified
Member since Feb 6, 2026
$30-250 AUD
$30-250 AUD
$30-250 AUD
$30-250 AUD
$250-750 AUD
min £36 GBP / hour
min $50 AUD / hour
$30-250 NZD
$750-1500 USD
$250-750 AUD
min $50 AUD / hour
$30-250 AUD
£1500-3000 GBP
$30-250 AUD
$30-250 USD
$250-750 USD
$750-1500 AUD
$30-250 USD
$15-25 USD / hour
$1500-3000 USD
₹12500-37500 INR