Preliminary Construction Project Scheduling

Kapalı İlan edilme: 1 ay önce Teslim sırasında ödenir
Kapalı Teslim sırasında ödenir

I've created a preliminary construction schedule in Primavera, but I need help refining and polishing it for an hour.

Oracle Primavera Microsoft Project Proje Yönetimi

Proje NO: #37809730

Proje hakkında

6 teklif Uzak proje Aktif 3 hafta önce

Bu iş için 6 freelancer ortalamada ₹2267 teklif veriyor

MagedAtya

Dear Sir , I have over 12 years of experience in planning and cost control in major industrial projects, and I am a professional in developing schedules on Primavera and preparing various project reports such as dashbo Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% INR
(2 Değerlendirme)
3.8
Asadjutt111

Building a successful data project, such as refining a construction schedule in Primavera, requires someone with not only comprehensive technical skills but also an understanding of the demanding and detail-oriented na Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% INR
(3 Değerlendirme)
2.7
ambaloch87

It is P6 or MS project Schedule ? Happy to assist for an hour or more as needed. Please see my profile, helped out several professional in past also working with PMC in Project Controls. I am looking forward to it. Tha Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% INR
(3 Değerlendirme)
2.3
kra5934554a00d64

My Schedules are Fool proof and construction friendly. They are based on actual buffers during construction and a realistic scenarios. I use latest Primavera 6.2 Software

₹1050 INR in 7 gün içinde
(0 Değerlendirme)
0.0