Tamamlanmış

Primavera installation

Install Primavera P6 stand alone version on my PC (running Windows 10) by taking remote control of the PC. I have the disks. Apparently Oracle XE needs to be installed.

Beceriler: Oracle Primavera, Computer Support, ERP Software, Oracle, Proje Yönetimi, SAP, Software Engineering, Sistem Yöneticisi, System Administration, Systems Engineering

Müşteri Hakkında:
( 55 değerlendirme ) Basingstoke, United Kingdom

Proje NO: #33729401

Seçilen:

(49 Değerlendirme)
5.2

Bu iş için 8 freelancer ortalamada $65 teklif veriyor

(170 Değerlendirme)
6.8
drkamine

Hello, I'm an IT expert with more than 15 years of experience in the IT industry . I'm Cisco Certified networking professional 300-100 and 300-115 and Linux Certified Professional lpi 101, 102 and red hat certified sys Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(86 Değerlendirme)
6.0
(42 Değerlendirme)
5.4
(9 Değerlendirme)
4.0
(2 Değerlendirme)
3.3
fayyazs789

Hello I m an Architect/Civil Engineer/BIM/CAD Expert and will offer you the Best Discount. You can pay me a reasonable price + Good Review only. I want to review your plans/sketches,/ideas and work with you. I know y Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0
Prem7Chand

I have experience in System Administration and Project management as well, I hope I will be able to help in this case as well

$100 USD in 7 gün içinde
(0 Değerlendirme)
0.0