Required: preliminary Primavera "P6" Schedule, Outline HS&E plan and QA/QC credentials.

I require:

1- preliminary Primavera "P6" Schedule (only preliminary based on the attached bill of quantities)

2- Organzational chart (attached but needs to be re-done in presentable way)

3- Outline HS&E plan (standard for construction projects)

4- QA/QC credentials. (standard for construction projects)

Should be easy job as the required schedule is preliminary not full details, other documents are standard and should be ready as it's used in any construction project..

My budget is 100$ and required within 2 days

Beceriler: Oracle Primavera, Proje Takvimlendirme, Proje Yönetimi

Daha fazlasını gör: configure sql server connection primavera p6, free trial version primavera p6, installing primavera p6, install primavera p6 sql problem, primavera p6 bad user error, primavera p6 database configuration, primavera p6 database configuration mssql, primavera p6 database connection error, primavera p6 database error, primavera p6 installation sql, primavera p6 trial, setup primavera p6 mssql, sql configuration primavera p6, sql server configuration primavera p6, primavera p6 planner freelance, vacancies freelance primavera p6 planner, what is primavera p6, design hs&e banner, freelance in primavera p6, freelance primavera p6 trainer in chennai

İşveren Hakkında:
( 5 değerlendirme ) Al-Salmiyah, Kuwait

Proje NO: #22299548

Bu iş için 14 freelancer ortalamada $99 teklif veriyor

hany74

Hello, I’m a mechanical engineer with a project management background in the fields of planning and scheduling projects in the disciplines of mechanical, civil, electrical, and IT projects. I utilize software such as M Daha Fazla

$140 USD in 7 gün içinde
(40 Değerlendirme)
5.0
tianaonline

Hi! I have checked your requirements on this research work. Do you have any additional instruction sheet? Do you have any reference materials? I know how to draft a plan that is not only free from plagiarism but also s Daha Fazla

$100 USD in 2 gün içinde
(0 Değerlendirme)
0.0
HelpingHut

Greetings, I am highly a qualified person with lots of professional expertise. I have served countless clients with complete level of satisfaction. I want you to hire me and check my level of expertise. I ensure you I Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0
InnovativeHub

Hello Sir/Madam, My name is FATIMA and writing is my passion “When I say work, I only mean writing. Everything else is just an odd job”. From my early age, I enjoyed reading novels and stories, as I was growing up it Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0
amanyelguendy

I am a planning engineer with 5 years of experience in primavera, i have done over 50 preliminary time schedule and about 20 detailed schedules, i am MBA holder in project management and i am IPMA level D certified, al Daha Fazla

$100 USD in 2 gün içinde
(0 Değerlendirme)
0.0
Akram8686

i am planning eng for 10 years,i have experience in this projects,i ended the PMP course and i worked for international companies

$166 USD in 2 gün içinde
(0 Değerlendirme)
0.0
EngSS77

From the BOQ, I think we're talking about a car parking of 3 stories underground + ground floor with expected average of 2,600 m2/floor, and with smart LC systems CCTV, VMS, BMS & BAS. Although I have a feeling about t Daha Fazla

$90 USD in 2 gün içinde
(0 Değerlendirme)
0.0
ShozabRizvi

i have reviewed the documents you have attached and understood the scope of work. i might need some architectural drawings in process of making schedule. i can get your task done as per your requirements.

$70 USD in 3 gün içinde
(0 Değerlendirme)
0.0
jjmaloth

Hi, I had been worked in Kuwait.I have 24 years of experience in Project planning and prepared EPC schedules for the project.I can supply a highlevel plan and I need to know what will be the Client's target finish date Daha Fazla

$100 USD in 7 gün içinde
(0 Değerlendirme)
0.0
lailaalfazzaa

Hello My name is Laila Alfazza’a and am a senior planning engineer from Jordan, I can help you with your project as I have a wide experience in Primavera schedules and I can submit a professional schedule to you within Daha Fazla

$100 USD in 2 gün içinde
(0 Değerlendirme)
0.0
EngWaleedRabeh

Am planning engineer with required requirements enable doing task in mean time Relevant Skills and Experience Primavera p6

$111 USD in 2 gün içinde
(0 Değerlendirme)
0.0
RajasthanInfra

Please give a chance to do this work and give you this work within days scheduled if you agree with this bid.

$100 USD in 3 gün içinde
(0 Değerlendirme)
0.0
maz5a9f9e383e48b

Hi hope you are fine. I am civil engineer and have 5 years of work experience in Planning and Management of Civil and MEP related Projects. I am currently working as a planning engineer and have very good command in Pr Daha Fazla

$150 USD in 3 gün içinde
(0 Değerlendirme)
0.0
1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0