Update the Riordan HR Integration Schedule based on feedback.

File name should have been "Week 2 George"

Project within scope of assignment, though there is duration on the Support

Product task.

You failed to meet the 42 detail task count requirement. 36

Project Start Date properly set.

The Summary Task Name for the Project should reflect the entire project and

be suffixed with Moniker. See Instructor Policies.

Some of your tasks need to be clarified. As stated in the Week 2 welcome,

when developing a schedule, the lowest or work level task must be action

oriented and should consist of a verb and an object.

Some of the tasks do not fit within the Summary. For example, you have

"Perform Vendor Response Requirements Gap Analysis" within "Integration Build

and Test".

The integrated HRIS is being developed in house with contractors that on

board from the previously failed project. Even if there were to be a purchased

product, what is it that the vendors have responded to? See additional

comments within content section.

First, the budget has been determined by Riordan. Riordan management will

review your schedule and based on various criteria, determine whether to accept

the schedule. Your proposed costs would be the cost of the project as

reflected within the schedule.

Second, the schedule needs to reflect the work necessary to develop the

integrated HRIS in house. Tasks need to be expanded to support the analysis,

design, and development of each of the HRIS modules (sub-systems) including

unit testing, integration testing, user testing, development of training, etc.,

as indicated in the feedback of your Statement of Work, which contained no

indication that a package would be procured.

Though all of your tasks are Auto Scheduled, As Soon As Possible, there are

numerous spelling errors, which detract from the quality of the schedule.

See details in the Assignment Tab Attachment

Beceriler: Microsoft, Proje Yönetimi

Daha fazlasını görün: user testing review, test review board, tab scope, development review board, week schedule, additional comments, work schedule, riordan, review feedback, integration test, hris, hr training, hr systems, hr management, auto update, integration testing example, schedule management, task name product, level project schedule, project instructor, training project 2013, project 2013 training, microsoft project 2013 training, cost management update, schedule design

İşveren Hakkında:
( 0 değerlendirme ) United States

Proje NO: #4407705

3 freelancer bu iş için ortalamada 202$ teklif veriyor

hansnld

I can do this for you when I have tiem next week

in 20 gün içinde250$ USD
(0 Değerlendirme)
0.0
tpksharma

Hi, i am from mauli services having 6+ years of experience in Project management. Having good experience in project planing with PERT chart technique.

in 3 gün içinde135$ USD
(0 Değerlendirme)
0.0
preshitp86

I am working in projects for last 5 years. I am good in project planning phase. I would help you to make a better schedule for your tasks with critical path. I am good in Microsoft projects. I am also certified in Proj Daha fazlası

in 5 gün içinde220$ USD
(0 Değerlendirme)
0.0