
Closed
Posted
I have a full drawing set for a new commercial building and now need an accurate Quantity Take-Off and Bill of Quantities focused solely on the structural package—concrete, reinforcement, structural steel, formwork, embeds and any related accessories. I will send you my own Excel template; simply keep the column order, formulas and coding I already use for cost control, but feel free to add supportive sheets if they help trace the calculations. Scope • Measure every structural item shown on the architectural, structural and general-notes plans. • Reference each line to its drawing number, grid line and level so the audit trail is clear. • Populate the template with quantities, unit descriptions and remarks where coordination is required. Acceptance criteria • Quantities reconcile within ±2 % when spot-checked against the IFC drawings. • No blank cells in mandatory fields (item code, description, unit, quantity). • Workbook opens error-free in Excel 2019 onward. You will receive PDFs, the template, and a short legend explaining my item codes as soon as we start. If you have questions about ambiguities in the plans, let me know early so we can resolve them before you proceed too far.
Project ID: 40695003
24 proposals
Remote project
Active 4 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
24 freelancers are bidding on average $19 USD/hour for this job

With over a decade of experience in engineering and architectural designs, I have cultivated skills that will be incredibly valuable for your commercial building project. My expertise in AutoCAD and BOM Analysis uniquely qualifies me to deliver an accurate and well-organized Quantity Take-Off (QTO) report. I understand the importance of maintaining your existing column order, formulas, and coding protocols for cost control, and I assure you these will be preserved while populating quantities, unit descriptions, and remarks. My proficiency in softwares such as ArchiCAD, Revit, and Tekla enhances my capacity to reference each line item on the drawings diligently - grid line-wise and level-wise, ensuring a clear audit trail. I am also comfortable with the other software tools your project may require - Excel 2019 onwards - having worked extensively with multiple software in my projects including highrise buildings, bridges etc.
$15 USD in 40 days
7.4
7.4

Hello, As an architect by profession, I possess deep-rooted skills in interpreting and analyzing intricate construction projects just like yours. Trust my vast command in AutoCAD, Building Architecture and Civil Engineering to meticulously measure and quantify every spatial element of your commercial building project, ensuring no detail goes unnoticed. Moreover, I understand the critical importance of coordination within the structure of a commercial project. Given this, my meticulous nature combined with my technical capabilities will enable me to reference every line in the BOQ clearly according to the drawing number, grid line, and level provided. You can be confident in my ability to maintain accurate audit trails for your construction team and stakeholders to follow without any confusion. Finally, one of our trademarks at Art Studio Agency is an unwavering commitment to timely delivery. I guarantee that your project will be handled with prioritized efficiency while bearing no compromise on the quality and integrity of the quantity take-offs. Together, we can transform your architectural blueprints into a vivid reality, taking your organization’s cost control system to new heights of precision and productivity. Let's establish a dependable collaboration matching our shared passions for excellence and perfection. Thanks!
$20 USD in 38 days
7.3
7.3

Hi there, I am a Civil Structural Engineer with lot's of experience in Quantity Take-off and Estimation and I can assist you with the Take-off of your commercial projects structural elements on a continuous basis. I do a detailed and traceable Take-off and estimations and have done similar jobs. Kindly chat me up to discuss further and agree on budget. Thanks. Best regards, Israel
$25 USD in 30 days
6.9
6.9

I understand you need a meticulous structural BOQ from your drawing set, similar to the detailed concrete and steel quantities I recently delivered for a mixed-use development, ensuring precise cost control. My approach involves using Bluebeam Revu for markups and precise area/length/count measurements directly from your PDF drawings. I'll then populate your provided Excel template, respecting all existing formulas and coding while potentially adding supplementary sheets for visual tracing of quantities, ensuring full traceability back to the drawings. Could you clarify if the drawings include any specific detailing notes that might impact reinforcement quantities, such as seismic requirements? I'm keen to discuss how my systematic process can deliver an accurate structural BOQ for your project.
$25 USD in 7 days
5.2
5.2

Hi there, I can prepare a detailed quantity takeoff and BOQ from your drawings and specifications with accurate, traceable measurements. ✅ Complete trade-wise takeoff ✅ Excel BOQ with quantities & descriptions ✅ Drawing references and assumptions ✅ Clean, editable workbook I have experience with Bluebeam, PlanSwift, AutoCAD, and commercial estimating. Portfolio: https://www.freelancer.com/u/ranaabubakar1993 Please share the drawings so I can review the scope and confirm the turnaround. Best regards, Rana
$20 USD in 40 days
4.5
4.5

Dedicated Freelancer Ready to Elevate Your Project for Commercial Building BOQ Take-Off. I have a solid background in AutoCAD, Civil Engineering, Construction, Building Architecture, Construction Management, Bill of Materials (BOM) Analysis, Excel and Quantity Surveying, I bring valuable expertise to your project. I have successfully completed many projects with 100% client satisfaction. Clear and timely communication is my priority. I believe in keeping you informed throughout the project lifecycle. I am available for a discussion at your earliest convenience. Please feel free to contact me to further discuss your project details. Thank you for considering my bid. I am excited about the opportunity to contribute to the success of your project. Please visit my portfolio to check my previous work samples, here - https://www.freelancer.com/u/GraphicsHub2k24?page=portfolio&w=f&ngsw-bypass= Best regards, Muhammad Asim Khan
$15 USD in 24 days
4.1
4.1

Hello! I have strong expertise in structural Quantity Take-Offs and BOQ preparation for commercial buildings. I will accurately measure concrete, reinforcement, structural steel, formwork, embeds, and accessories while retaining your Excel template’s column order, formulas, and cost-control coding. Every item will be traceable to the relevant drawing number, grid line, and level, with clear remarks for coordination issues and supporting calculation sheets where required. I will deliver a complete, error-free Excel workbook with no blank mandatory fields and quantities checked against the IFC drawings to meet the ±2% acceptance tolerance.
$19 USD in 20 days
4.1
4.1

Hello, I reviewed the requirements, and the key challenge is producing a highly accurate structural quantity take-off while maintaining a clear audit trail back to the IFC drawings and preserving your existing Excel cost-control structure. I would measure concrete, reinforcement, structural steel, formwork, embeds, and related accessories across the architectural, structural, and general-notes drawings, then populate your Excel template with the required item codes, descriptions, units, quantities, drawing references, grid lines, levels, and coordination remarks. I would also cross-check quantities against the drawings and use supporting calculation sheets where useful so every major quantity can be traced and reviewed without disrupting your existing formulas or column structure. I have experience with structural quantity take-offs, BOQs, construction drawings, Excel-based measurement, and detailed quantity documentation, and can share relevant examples once we connect in chat. Best Regards, Muskan
$15 USD in 36 days
4.0
4.0

You need a structural package quantity take-off from your commercial building drawings, and I will start by reviewing all your provided plans to establish a clear understanding of the building's structural scope. I will build the Bill of Quantities using AutoCAD for precise measurements and then populate your Excel template, maintaining your column order, formulas, and coding for cost control. I will measure concrete volumes, reinforcement bar weights, structural steel members, formwork areas, and embed items directly from the architectural, structural, and general notes plans. Each line item will reference its specific drawing number, grid line, and level for a clear audit trail. I will add remarks for any required coordination, so you can see where further integration might be needed. I will not be using a separate quantity take-off software to generate a new template. Your template is the deliverable, and adding another layer of software introduces unnecessary complexity and a potential point of failure in reconciling your existing cost control system. What level of detail are you expecting for the concrete quantities, specifically regarding different concrete mix designs if they are not explicitly called out per structural element? I am a Preferred Freelancer on Freelancer with a 5.0 rating, 100% on time and 100% on budget. By the end of the first day or two, you will have a populated Excel sheet with initial quantities for concrete and reinforcement based on the main structural elements, also a clear starting point for the structural steel take-off.
$25 USD in 7 days
3.1
3.1

Hi, I’d be happy to prepare the structural Quantity Take-Off and BOQ for your commercial building. I can measure concrete, reinforcement, structural steel, formwork, embeds, and related items accurately while maintaining your existing Excel template, formulas, and coding. I’ll include clear references to drawings, grid lines, and levels so every quantity can be easily audited. I’ll also check the quantities carefully against the IFC drawings and flag any coordination issues or ambiguities early. I’m ready to review your PDFs, Excel template, and item-code legend and get started.
$20 USD in 40 days
2.6
2.6

I will provide Accurate Quantity Take off for the structural package—concrete, reinforcement, structural steel, embeds and any related accessories as per Yout Excel Template.
$20 USD in 40 days
2.5
2.5

Hi, I can prepare an accurate structural Quantity Take-Off and Bill of Quantities from your IFC drawing set, covering concrete, reinforcement, structural steel, formwork, embeds, and related accessories. I can work directly within your Excel template while preserving the existing column order, formulas, item coding, and cost-control structure. Each quantity will be traceable to the relevant drawing number, grid line, and level, with supporting calculation sheets added where useful. I’ll carefully cross-check the architectural, structural, and general-notes drawings, flag any discrepancies early, and ensure all mandatory fields are completed. The final workbook will be organized for easy auditing and compatible with Excel 2019 onward. I’m experienced in structural drawings, construction documentation, and quantity-related take-offs, with a strong focus on accuracy and detailed checking. Please share the PDFs, Excel template, and item-code legend so I can review the scope and confirm the turnaround.
$20 USD in 40 days
2.5
2.5

Hi,Structural quantity take-off — concrete, reinforcement, structural steel, formwork, embeds — measured against drawing number, grid line and level for a clean audit trail is exactly the kind of detailed structural work I handle. I've worked with reinforcement schedules and quantity tracking across concrete frame buildings up to 55,000 m² with multiple basement levels, where keeping quantities traceable to grid and level was essential for cost control on multi-block layouts. I'll keep your existing Excel template's column order, formulas and coding intact, adding supporting sheets only where they help trace the calculations, and target the ±2% reconciliation against your IFC drawings with no blank mandatory fields. Send over the PDFs, template and item-code legend whenever you're ready to start — happy to flag any plan ambiguities early. Best regards, Aleksander Mach
$15 USD in 60 days
1.3
1.3

Hi! I'm interested in your project and have experience preparing accurate structural Quantity Take-Offs and Bills of Quantities from IFC drawing sets. I'll measure all structural elements, populate your Excel template while preserving its formulas and coding, reference each item to the relevant drawing, grid, and level, and clearly document any assumptions or coordination notes. Before I begin, could you please clarify: * ✅ Please share the PDF drawing set, Excel template, and item-code legend. * ✅ Which measurement standard or project-specific rules should I follow? * ✅ Are there any preferred assumptions for unclear or missing structural details? I look forward to working with you!
$16 USD in 10 days
1.1
1.1

I recently helped a business improve their architectural designs and create a cleaner, more professional design workflow that improved accuracy and made projects easier to develop. We can help you achieve the same result by creating clean, detailed, and reliable designs that match your requirements and give you a smooth experience. I understand the importance of accurate Quantity Take-Offs and the need for a clear audit trail with references to drawing numbers and grid lines. Your focus on maintaining consistency in your Excel template is essential for effective cost control. We specialize in AutoCAD, Revit, Inventor, architectural design, 2D drafting, 3D modeling, 2D and 3D rendering, animation, and detailed technical drawings. I'd be happy to discuss your project in more detail and answer any questions. I can also share similar work I've completed and explain the best approach for your project. Regards, Neels Botes
$19 USD in 7 days
0.0
0.0

I am having 18 yrs of experience in project qs, management, boq preparation. I believe that I can fulfill your requirements.
$23 USD in 40 days
0.0
0.0

Hello, I have 20 years of experience in Quantity Surveying, Billing, Estimation, Cost Control, and Contracts, with strong experience in BOQ preparation, quantity take-off, rate analysis, interim/final billing, variations, and contract administration. I have reviewed your requirement and can provide accurate and professional work within the agreed timeframe. I can also work with Excel, drawings, BOQs, specifications, and other project documents as required. I focus on accuracy, attention to detail, timely delivery, and clear communication. I am available to discuss your project requirements and can start immediately. Please share the project details, drawings, BOQ, or scope of work so I can review and confirm the deliverables. Regards, Veera Babu Quantity Surveyor / Contracts Professional
$15 USD in 40 days
0.0
0.0

Aswān, Egypt
Member since Aug 27, 2026
$15-25 USD / hour
$15-25 USD / hour
$15-25 USD / hour
$15-25 USD / hour
$250-750 USD
₹100-400 INR / hour
₹1500-12500 INR
£10000-20000 GBP
$250-750 USD
$250-750 USD
$250-750 CAD
$100-300 USD
₹12500-37500 INR
$75-80 USD
$70 USD
$250-400 AUD
$250-750 AUD
$5000-10000 CAD
$250-750 USD
$250-750 USD
£20-250 GBP
$250-750 USD
£750-1500 GBP
$250-750 USD
£20-250 GBP