
Closed
Posted
Paid on delivery
A scheduled snapshot for May 2025 never ran, so the dataset for that period is blank. The files that feed the snapshot are still available in our cloud storage, and the warehouse we query from is Snowflake. I need someone to: • rebuild the missing May 2025 partition in the existing snapshot table, • follow the same logic and column order used by the other monthly snapshots, • run basic row-count and checksum comparisons against source files to confirm accuracy, and • provide the SQL (or Snowflake tasks/procedures) you use so I can re-run it later if needed. Everything else about the pipeline is unchanged; only this one month is missing. Please let me know how quickly you can turn it around and what access you’ll need.
Project ID: 40732669
30 proposals
Remote project
Active 3 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
30 freelancers are bidding on average ₹6,520 INR for this job

Hi, I can backfill the missing May 2025 snapshot using the existing monthly logic, without changing unrelated periods. I would inspect the table schema, a successful neighbouring run and the May source manifest, then load into a staging table for row-count, key, null and checksum reconciliation. The final write would be scoped to May and designed to be safely rerunnable, with a backup/rollback plan agreed before touching production. You will receive the SQL and a short validation report. I need read access to the source files and existing SQL plus a least-privilege Snowflake role for the approved staging/write operations. Are the original snapshot query and source-file list available?
₹10,000 INR in 3 days
3.0
3.0

Hi — I'll fix the missing May-2025 snapshot: trace why the scheduled job didn't run, backfill the period from source, validate against the surrounding periods, and add a guard so a silent miss can't recur. I hold a 5.0-star rating here and deliver clean, tested, working code. We can start with a small funded milestone so you see real progress before committing further. Ready to start today — happy to talk through the details. - Ricardo
₹1,500 INR in 4 days
2.5
2.5

Hello Sir, I have already worked on similar types of website and software development projects and I am confident that I can successfully handle your project. I am a full-time freelancer with **17+ years of experience** in web development, software development, automation, and API integrations. My expertise includes: * ASP.NET C# web and software development * Android app development * Python automation and web scraping (Amazon, Instagram, Facebook, Google Maps, LinkedIn, Telegram, and other custom scraping solutions) * JavaScript, jQuery, AJAX, Bootstrap, HTML5 * Microsoft SQL Server database development * Payment gateway integration * SMS, Email, Banking, Financial, and Insurance API integration * Custom automation bots and workflow automation software I focus on delivering **high-quality, scalable, and reliable solutions** with clean code and long-term support. Please contact me in private chat so we can discuss your requirements in detail. I can also show you a **demo of similar projects** I have completed. Looking forward to working with you. Thanks & Regards
₹12,500 INR in 8 days
2.2
2.2

Your May snapshot gap is creating downstream reporting holes that compound every day it stays empty. If your BI dashboards or compliance audits depend on month-over-month continuity, this missing partition is already skewing trend analysis. Quick questions - are the source files in S3 or Azure Blob, and do you have existing DDL or stored procedures I can reference to match the snapshot logic? And does your Snowflake warehouse use time-travel retention that lets me validate against April or June snapshots? Here is the architectural approach: - SNOWFLAKE: Clone the existing snapshot table structure, backfill May 2025 partition using COPY INTO with file format matching your current pipeline, then MERGE into production with partition swap to avoid downtime. - DATA INTEGRATION: Parse source files with the same transformation logic (joins, aggregations, deduplication) already applied to other months, validated by comparing row counts and MD5 checksums against your April/June baselines. - SQL: Deliver commented DDL, COPY commands, and a reusable stored procedure so your team can repeat this process without my involvement if another month fails. I've rebuilt missing partitions for 4 data warehouses where scheduled jobs silently failed and no one noticed for weeks. Let's get on a 15-minute call so I can see your table schema and confirm turnaround time before you assign this.
₹6,300 INR in 3 days
3.7
3.7

Hi, I can rebuild the missing May 2025 partition for you. Yes: I will rebuild it in the existing snapshot table, using the same logic and column order as your other monthly snapshots. Yes: I will run row-count and checksum comparisons against the source files and share the results. Yes: you get the SQL (or a Snowflake procedure/task) so you can re-run it later. First step: I read the April and June snapshot logic and the May source files to confirm they match, before writing anything to the table. Relevant work: for a retail client (Hot Topic, via Nimbus Consulting) I built Snowflake ETL pipelines and migrated historical inventory fact tables from SQL Server to Snowflake, with data quality checks throughout. Freelancer record: 6 reviews, 4.97 average, 100% on time and on budget. Access needed: a Snowflake role with read access to the stage/cloud files and write access to the snapshot table (a dev copy first is fine). Moizam
₹7,000 INR in 7 days
1.2
1.2

I can rebuild just the missing May 2025 snapshot in Snowflake and give you rerunnable SQL plus the row-count and checksum results. I would first read the SQL used for a working month, then rebuild May in a staging table using the same transformations and column order. After checking the staged result against the May source files, I would write only May into the snapshot table and verify the other months are unchanged. The rerun must not duplicate rows. Access needed: read access to the May files and existing snapshot SQL/table DDL, plus a Snowflake role allowed to create staging tables and write the target month. No account-admin access is needed. INR 1,500 fixed. I estimate 6 working hours once access, the existing SQL and source files are available, within the one-day bid period. I'll flag any source-data gaps before changing the target. For the initial review, please share the snapshot SQL, table DDL and a small May source sample; these are needed to validate sample output rather than guess the monthly logic. Payment is released after you verify the rebuilt data.
₹1,500 INR in 1 day
0.0
0.0

Hi, You need May 2025 filled in so it looks exactly like every other month, with proof that it matches the source files. That way nobody downstream can tell it was ever missing. What I would do: - Read how your other monthly snapshots are built and copy that logic and column order exactly - Load May's files from your cloud storage into a separate scratch table first, so your live table is untouched while I check it - Compare row counts and checksums against the source files, and send you the results - Move May into the real snapshot table only after you approve those numbers - Hand over the SQL as a reusable Snowflake procedure, so any month can be rebuilt with one command Access I would need: read access to the storage location Snowflake uses for these files, and a role that can create a scratch table and write to the snapshot table. INR 12,500, delivered within 5 days. One question: is the monthly snapshot built by a Snowflake task or procedure I can read, or by a script or tool outside Snowflake? Happy to start as soon as the access is set up. Thanks, Bhagya
₹12,500 INR in 5 days
0.0
0.0

The missing May 2025 partition means the snapshot table has a gap that has to be rebuilt from the same source files without breaking the row structure the other months use. Delivery: I read the existing snapshot logic and column order from one working month, rebuild May 2025 as an INSERT following that same pattern, then run row-count and checksum checks against the source files in cloud storage. v1 (rebuilt partition plus validation output) within 2 working days of getting read access to the table DDL and the May source files. Here is the shape of the rebuild step, done now: INSERT INTO snapshot_table SELECT column_a, column_b, column_c, load_date FROM source_stage WHERE file_month = '2025-05' QUALIFY ROW_NUMBER() OVER (PARTITION BY key_col ORDER BY load_ts DESC) = 1; Followed by a checksum query comparing HASH_AGG(*) between source and target for that partition. I do not promise the row counts will match on the first pass if the source files themselves have gaps, that gets reported honestly rather than forced to match. Question: can you share the exact column list and the query used for a previously working month, so the May rebuild mirrors it exactly. Price: 4300 INR fixed · Timeline: 3 working days from access/brief Konrad
₹4,300 INR in 3 days
0.0
0.0

Fixed-price INR 7,500, done within 1 day after access: rebuild the missing May 2025 partition in your Snowflake snapshot table. How I'll do it: 1. Read the SQL or task that builds the other monthly snapshots and reuse the same logic and column order. 2. Load the May 2025 files from your cloud storage into a staging table first, then insert into the snapshot table - nothing else is touched. 3. Compare row counts and checksums against the source files, and hand you a re-runnable SQL script (or stored procedure) with a short note on how to use it. The payment sits in a Freelancer milestone and is released only after you've checked the result. You work directly with me - Luna, Flow Lab. Access I'd need: a Snowflake user with a role limited to that schema (read on the stage, write on the snapshot table), no admin rights. Where does the SQL for the other months live - a Snowflake task/procedure, or dbt/Airflow?
₹7,500 INR in 1 day
0.0
0.0

The risky part of a backfill isn't the SQL, it's that May's numbers depend on what your dimensions looked like in May. If the snapshot joins to customer, product or account tables that have changed since, running the same logic today produces a May partition nobody could have produced in May, and it won't tie to anything you reported at the time. So the first thing I'd check is whether those joins are as-of joins on effective dates or plain current-state joins. If it's the second, the backfill has to come from the source files themselves, or from history tables if you keep them. Second, it has to be safe to run twice. I'd wrap it as delete-then-insert for that one partition inside a transaction, so a half-finished run doesn't leave you with duplicate May rows on the retry. Then the checks you asked for: row counts against the source files, sums and checksums on the numeric columns, and a column-order comparison against an adjacent month so the partition matches its neighbours exactly. You'd get it as a Snowflake procedure you can re-run for any month, not just this one, with the validation queries beside it. What access would I get, a role on the database and read on the storage stage? Ronak
₹6,000 INR in 3 days
0.0
0.0

Hello, I understand you need to rebuild the missing May 2025 partition in your existing Snowflake snapshot table using the available cloud-storage source files. The goal is to restore the missing data while exactly matching the existing monthly snapshot logic and structure. Here’s what I can provide: * Recreate the May 2025 partition using the existing snapshot logic and column order. * Perform row-count and checksum comparisons against the source files for validation. * Provide reusable SQL/Snowflake tasks or procedures with clear execution instructions. I bring over 4+ years of experience in SQL, Python, data processing, ETL, data integration, and databases, with a strong focus on accurate and maintainable data pipelines. Just to clarify a few things: * Which cloud storage platform contains the May 2025 source files? * Can you provide access to the existing snapshot table and a recent completed monthly partition for logic comparison? Please come to the chat box to discuss more about your project. Best regards Indresh Kushwaha
₹15,000 INR in 7 days
0.0
0.0

One missing month is a clean fix when May 2025 is rebuilt with exactly the same SQL the other months use, so the first thing I'd do is read how April and June were built. My plan: - You create a Snowflake user with a role limited to the snapshot table, the stage and a warehouse, so you never share your own login - I rebuild May 2025 from the source files, same logic and column order as the other months - I compare row counts and a checksum (Snowflake's HASH_AGG) between the source files and the new rows - You get the SQL as a re-runnable script, or a stored procedure if you prefer One pitfall I'll check: May 2025 files are far past Snowflake's 64-day load history, so COPY INTO can skip them silently as "load status uncertain" unless that is handled. I'll confirm every file loaded before trusting a count. You'll have it done within 2 days. Is the snapshot built by a Snowflake task, or by an outside tool such as dbt or Airflow? Chaman
₹1,500 INR in 2 days
0.0
0.0

I can compare the surrounding monthly Snowflake snapshots, rebuild only the missing May 2025 partition with the same column order and logic, and validate row counts and checksums against the source files. I will provide the SQL used so the backfill can be rerun. I can begin after award with scoped read/write access to the relevant data.
₹3,000 INR in 3 days
0.0
0.0

Hello, I can rebuild the missing May 2025 snapshot partition in Snowflake using the same logic and column order as the existing monthly snapshots. I’ll validate the rebuilt data with row counts and checksum comparisons against the available source files. I’ll also provide clean, reusable SQL or Snowflake tasks/procedures so the process can be rerun later. I can work with the existing pipeline structure and only make the required changes for the missing month. Best Regards Fatima
₹1,500 INR in 1 day
0.0
0.0

Hello, I am interested in helping rebuild the missing May 2025 snapshot partition. My experience includes SQL, Python, ETL workflows, data cleaning, validation, and working with structured data pipelines. I can review the existing monthly snapshot logic, reproduce the same column order and transformations, and backfill only the missing May 2025 data. I will also: * Compare source and snapshot row counts * Run checksum and data-quality checks * Verify the May partition against neighboring months * Provide clean, reusable Snowflake SQL or a task/procedure * Document the steps required to run it again I would need access to the Snowflake schema, the source files or storage location, the existing snapshot table, and one or two completed monthly snapshots for comparison. I am detail-oriented and can start immediately.
₹7,000 INR in 5 days
0.0
0.0

Hi, I can rebuild the missing May 2025 snapshot without changing the rest of your pipeline. I would first mirror the schema, column order and transformation logic used by the surrounding monthly snapshots, then rebuild only the May partition and validate it with row-count and checksum comparisons against the source files. I would also leave you the exact Snowflake SQL/procedure used so the backfill can be reproduced later. I have relevant hands-on experience with SQL, ETL, data integration and database workflows, and I already reproduced the core backfill scenario internally with an idempotent month-scoped test before bidding. I would just need access to the May source files plus the relevant Snowflake objects or a staging environment. I can turn this around in about 2 days.
₹6,000 INR in 2 days
0.0
0.0

Hello, I can rebuild the missing May 2025 Snowflake snapshot partition while preserving the exact logic and schema used by the existing monthly snapshots. My approach would be: • Review the existing snapshot table and neighboring monthly partitions • Identify the SQL/task/procedure responsible for the normal monthly snapshot • Verify the May 2025 source files in cloud storage and their expected schema • Reproduce the same transformations, column order, data types, and business logic • Backfill only the missing May partition without affecting existing months • Validate source vs snapshot row counts • Run checksum/hash and key-level comparisons to detect missing or altered records • Check duplicates, NULL patterns, and date boundaries • Provide clean, reusable Snowflake SQL/scripts for future backfills • Document the validation results and execution steps My background in Python, SQL, databases, data cleaning, and automation fits this type of targeted pipeline recovery well. I would need appropriate Snowflake access, read access to the May source files/cloud location, the snapshot table/schema, and access to the existing snapshot SQL/task/procedure. I can confirm the turnaround once I inspect the current pipeline and May data volume.
₹1,500 INR in 3 days
0.0
0.0

With my extensive expertise in SQL and my innate ability to streamline processes, I am primed to rebuild the missing May 2025 partition in your existing snapshot table. Rest assured, I will follow the same logic and column order used in your other monthly snapshots, ensuring a consistent and seamless integration with your data pipeline. Furthermore, I'll run row-count and checksum comparisons against the source files to confirm and maintain data accuracy. On a practical note, I have hands-on experience with Snowflake, your current warehouse system, enhancing my suitability for this project. Following best practices, I will document the code or procedures used so that they can be easily replicated by you or your team if need be. Moreover, my commitment to precision aligns perfectly with your requirements for "clean code" and "clear data insights." I guarantee to provide high-quality work delivered in a timely manner. By entrusting me with this task, you're partnering with someone who is solely dedicated to transforming complex problems into actionable solutions while keeping you involved just as much as you want throughout each step of the process. So why wait? Let's turn this blank dataset into a reliable source of valuable information!
₹7,000 INR in 1 day
0.0
0.0

Hi, I’m Nayeem, a Full Stack Developer with 10+ years of experience working with SQL, databases, cloud data systems, and data processing workflows. I can reconstruct the missing May 2025 partition in Snowflake while preserving the existing snapshot logic, schema, and column ordering. I’ll first review the surrounding monthly partitions, source files, existing SQL/tasks/procedures, and transformation logic to determine exactly how the May dataset should be rebuilt. After reconstruction, I’ll validate the result using row counts, checksums, key-field comparisons, and other relevant consistency checks against the available source data. You’ll receive the rebuilt partition along with the SQL/Snowflake procedures used to generate it, so your team can understand, reproduce, and rerun the process when required. My focus will be accuracy, traceability, and leaving you with a repeatable solution rather than a one-off data fix.
₹7,000 INR in 5 days
0.0
0.0

Hi, I can rebuild the missing May 2025 partition in your Snowflake snapshot table using exactly the same logic and column order as the other monthly snapshots, and hand you a re-runnable script. I'm a systems engineer and DBA with 18+ years in data warehousing and ETL (Oracle, SQL Server, and ETL administration at a telecom), so backfilling a partition safely is routine for me. How I'll do it: 1. Review the SQL/task that builds a normal month (for example April or June) and reuse the same logic, parameterized by month 2. Stage the May 2025 source files from your cloud storage (COPY INTO a staging table), then insert only the May partition, so no other month is touched 3. Validate: row counts and checksums (HASH_AGG) against the source files, plus a comparison of totals with the neighbouring months 4. Deliver the SQL (or a Snowflake stored procedure/task) and a short validation report, so you can re-run it for any month in the future Access I'd need: a Snowflake role with read on the stage/source files and write on the snapshot table (a dev/clone first is ideal, I can use a zero-copy clone to test before touching production). I can turn it around within 1 to 2 days once I have access. Best regards, Gabriel
₹6,000 INR in 2 days
0.0
0.0

India
Payment method verified
Member since Feb 8, 2018
₹600-1500 INR
₹400-750 INR / hour
£18-36 GBP / hour
₹12500-37500 INR
min $50 USD / hour
₹100-400 INR / hour
₹750-1250 INR / hour
₹750-1250 INR / hour
$250-750 USD
$250-750 USD
$15-25 USD / hour
$30-250 USD
₹600-1500 INR
$250-750 USD
$10-30 USD
$250-750 USD
$30-250 USD
£10000-20000 GBP
₹70000-90000 INR
₹12500-37500 INR
₹8000-12500 INR