Kapalı

example on using GA to solve power plant scheduling problem

Bu iş için 5 freelancer ortalamada $29 teklif veriyor

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% AUD
(6 Değerlendirme)
3.2
1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% AUD
(3 Değerlendirme)
3.0
pairamesh9

Will do as per requirement in a day Relevant Skills and Experience Catia,pro E, FEM analysis

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% AUD
(0 Değerlendirme)
0.0
ameerafelesteen

Hi I am an industrial engineer and have knowledge in genetic algorithms, scheduling and artificial intelligence. I would like to work with you Please feel free to contact me for further details.

in %bids___i_period_sub_35% gün içinde30%project_currencyDetails_sign_sub_37% %project_currencyDetails_code_sub_38%
(0 Değerlendirme)
0.0
Anakie

What do you actually want? You have tagged PLC/SCADA but what do you need? Why have you tagged Catia, FEA and other things - very confusing Relevant Skills and Experience Over 25 years of Automation and Control System Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% AUD
(0 Değerlendirme)
0.0