
Closed
Posted
Paid on delivery
This is not a start from zero project. We have preliminary files. (See number 9 for details) YOU MUST DOWNLOAD A MSWORD FILE TO GET THE FULL SCOPE. This site has limited space and was not able to give full scope here STEPS TO PROJECT BEING AWARDED 1. Download and read PDF WORK SCOPE 2. Download & Sign NDA & upload here. 3. Government ID (Blank sensitive information 4. Send Engineer License information. 5. Engineer Business Address & Business phone number for verifying legitimate business. 6. Engineer Business Credentials. Business License, Sales Tax Certificate or comparable 7. Letter from engineer authorizing you to do work if not the actual engineer 8. Video Chat to confirm we are who we say we are. 9. WE WILL THEN SEND CAD FILES WITH DRAWINGS, COMBINED WIND LOAD CALCULATION AND STRUCTURAL SCREENING PACKAGE, PRELIMINARY PERMIT SCOPE WITH ALL BOM NUMBERED MEMBERS, FOR YOU TO EVALUATE 10. Confirm the files are viable to your format of using them to complete the job 11. Cost of repeat ongoing installs for Structural Repeat 12. Cost of repeat ongoing installs for Site Survey. 13. Anything we ask of you, we are willing to do the same 14. Contract Signing NDA ATTACHED AND FULL IDENTITY VERIFICATION WILL BE REQUIRED BEFORE CAD FILES, WIND TEST AND PERMIT SCOPE IS RELEASED. If you are not the Engineer or out of the country you and the engineer must provide Government ID such as Driver's Lic. and a letter from the Engineer stating you are authorized to work on his behalf and we will have to have a video call to verify we are whom we say we are. We will gladly provide. Blank out sensitive information on ID If you do not address the full scope, your quote will not be considered
Project ID: 40564434
9 proposals
Remote project
Active 7 days ago
Set your budget and timeframe
Get paid for your work
Outline your proposal
It's free to sign up and bid on jobs
9 freelancers are bidding on average $2,222 USD for this job

Hi, I can assist with preparing and coordinating structural permit drawings for your Florida project while ensuring the documentation is organized and compliant with applicable Florida Building Code requirements and local permitting standards. I have experience working with structural plans, construction documents, and permit packages, and I pay close attention to accuracy, detail, and code compliance throughout the process. I will review your existing plans, incorporate the required revisions, and prepare a complete structural drawing package ready for permit submission. This includes structural framing plans, foundation details, schedules, notes, and construction details, while coordinating with your engineer or design team as needed to help ensure the final documents meet jurisdictional requirements. I am committed to delivering high-quality work on time while maintaining clear communication throughout the project. My goal is to provide a professional, well-organized structural permit package that supports a smooth review process and complies with Florida standards. I look forward to discussing your project and helping you achieve a successful permit approval.
$1,500 USD in 7 days
4.9
4.9

Hello there, When I worked on the structural permit and engineering compliance for complex projects, ensuring adherence to local codes was critical. This experience applies directly to your need for a Florida-compliant structural permit considering the limited site space and the detailed scope provided in your documents. I have delivered success on projects requiring detailed structural engineering oversight and code compliance, similar to the work done on the engineering for structural frameworks like those on the 6-7-26 X3 step files you shared. My approach would be: 1) Thoroughly review the provided scope and CAD files after NDA agreement, 2) Develop a compliant structural permit plan considering Florida’s unique wind and building codes, 3) Submit for review and finalize with your feedback. A realistic first milestone could be the initial scope assessment and compliance checklist delivery within the first week post-NDA. Could you please clarify which specific Florida wind loading standards must be prioritized for the permit? Thanks,
$2,000 USD in 15 days
0.0
0.0

Orlando, United States
Member since Jun 18, 2026
$1500-3000 USD
£250-750 GBP
$30-250 AUD
$400-1200 USD
$750-1500 AUD
₹1500-12500 INR
$250-750 USD
£18-36 GBP / hour
$3000-5000 USD
₹2500-5000 INR
£250-750 GBP
$750-1500 AUD
$250-750 USD
$40-75 USD / hour
$30-250 USD
$1500-3000 USD
$10000-150000 USD
$30-250 USD
£250-750 GBP
$30-250 USD
$250-750 USD