Profile image of RONVILTECH
@RONVILTECH
Flag of Philippines Cagayan De Oro City, Philippines
Member since September, 2014
0 Tavsiye

RONVILTECH

Çevrimiçi Çevrimdışı
Seventeen (17) years extensive international experience in the field of Electrical engineering, specializing in engineering / design / consultant for oil and gas projects both offshore and onshore facilities, such as top-side module on FPSO / platform, refinery, pump station and tank farm in performing feasibility studies, FEED, conceptual, detailed design and EPCC, preparation and supervision in designing electrical substations and downstream distribution system. Have an experience in power system analysis / calculations, including ETAP and all other relevant vendor software calculations, and performs project coordination, pre-qualification programs and tender document preparations. Responsible to providing leadership, technical support to all electrical engineers and designers involved in a project with respect to quality, conducting technical critiques of projects and ensuring resource requirements meet current and future workloads.
$65 USD/sa
0 değerlendirme
0.0
  • N/ATamamlanmış İş
  • N/ABütçe Dahilinde
  • N/AZamanında
  • N/ATekrar İşe Alınma Oranı

Portföy

Son Değerlendirmeler

Değerlendirme yok.

Deneyim

Electrical Engineer

Dec 2010 - Mar 2014 (3 years)

 Garraf Field Development Project (Iraq) - First Commercial Production Facility • Both involved in the preparation of Front End Engineering Design (FEED) and Engineering, Procurement, Construction & Commissioning (EPCC) project phase. Provided support during the entire period of fabrication and site construction of Garraf Field Development Project located in Iraq, consisting of 2 Trains with 100,000 barrel of oil per day (BOPD). • Preparation of long lead electrical equipment technical specifications and data sheets, Key plant single line and substation single line diagrams, substation and equipment layout, establishment of loadlist, preliminary calculations (e.g. UPS, MV and LV cable sizing), cable schedule and main power cable routing. • Reviewed/checked other disciplines documents and drawings, attended management, discipline, progress, vendor and client meeting/discussion. Supervised group of electrical engineers, designers and support personnel. • Preparation and review of drawing lay out, single line, cable block, schematic, interconnection diagram, load flow analysis, short circuit analysis, motor starting analysis, transient stability analysis, ground grid design, relay coordination and setting using ETAP. • Equipment sizing and selection of alternator, transformer, HV/LV switchgear, UPS, HVAC, power & control cable, lighting system (indoor/outdoor), and preparation of Technical Bid Evaluation (TBE) and carried-out report, selection of vendor.

Senior Electrical Designer

Mar 2008 - Mar 2009 (1 year)

 Shell Alliance Project - Shell Scotford Refinery/Upgrader  Plant-25 Gas Precipitator Unit - Syncrude Canada Ltd  Movable Slurry Facility - Suncor Energy Ltd • Basically involved in a maintenance activity on the re-route and upgrade of the 11kV to 25kV overhead transmission line, conducted site surveys related to addition of motor loads and sizing of cable, the selection of starter and overcurrent protection. • Mainly involved in the scheduled turnaround maintenance activity such as, preparation of work packs related to the isolation, removal and replacement of burnt precipitator unit, and performed cable schedule modifications according to the work pack sequence of activity. • All throughout involved in the preparation of FEED design by attending weekly progress meeting, establishing load list, sizing and selection of SWGR/MCC, transformer, VFD, and heater. Preparation of substation equipment layout and grounding system for designer to produce CAD working drawings, the cable schedule, and prepared material take-off.

Senior Electrical Engineer

Aug 2006 - Mar 2008 (1 year)

 MVHarta 1, Supply Vessel Conversion Project - Harta Offshore & Marine Services  AKJO-KHAFJI FDP Phase-1 Oil & Gas Project - EnPPI/Schneider Electric • Provided consultancy services to Harta Offshore on their vessel conversion project in performing ETAP short-circuit system analysis, conducted site surveys and developed overall single line diagram, cable routing layout, performed design calculations, sizing/selection of equipment and cable to suit, preparation of cable schedule, developed cable block and interconnection diagram based on the interfaced information from client and vendor/supplier. • Involved in the preparation of Engineering, Procurement, Construction & Commissioning (EPCC) of Three (3) E-House project delivered to ARAMCO. The work involved herein was to provide EPCC scope to deliver E-House for oil & gas offshore platforms to AKJO-Khafji.  Preparation of long lead electrical equipment technical specifications and data sheets, substation single line diagram, substation and equipment layout, establishment of loadlist, preliminary calculations (e.g. UPS, MV and LV cable sizing), cable schedule and main power cable routing.  Equipment sizing and selection of transformer, HV/LV switchgear, UPS, HVAC, power & control cable, lighting system (indoor/outdoor), and preparation of Technical Bid Evaluation (TBE) and carried-out report, selection of vendor.  Reviewed all electrical design and drawings prepared by engineers/designers and attended discipline meetings. Provision of technical support to the projects and preparation of man-hour estimate. Instructed and supervised subordinates to enable them to perform their work effectively. Ensure familiarity with and implement the requirements of the Health, Safety and Environment and Quality Management System.  Monitored and contributed input on weekly progress to project management team. Witnessed FAT and performed pre/commissioning on HVAC and fire protection systems.

Senior Electrical Engineer

Nov 2005 - Jul 2006 (8 months)

 Petrobras Espadarte Sul RJS-409 FPSO - Modec/Siemens  Petrobras PRA-1 FPSO - Modec/Siemens  FPU P-53 Turret Equipment Room - SBM/Siemens  Exxon Mobil E&I Building - Aker Kvaerner/Siemens • Involved in the preparation of Engineering, Procurement, Construction & Commissioning (EPCC) of Four (4) E-House projects delivered to Petrobras & Exxon Mobil. The work involved herein was to provide EPCC scope to deliver E-House for oil & gas onshore/offshore platforms.  Preparation of long lead electrical equipment technical specifications and data sheets, substation single line diagram, substation and equipment layout, establishment of loadlist, preliminary calculations (e.g. UPS, MV and LV cable sizing), cable schedule and main power cable routing.  Equipment sizing and selection of transformer, HV/LV switchgear, UPS, HVAC, power & control cable, lighting system (indoor/outdoor), and preparation of Technical Bid Evaluation (TBE) and carried-out report, selection of vendor.  Reviewed all electrical design and drawings prepared by engineers/designers and attended discipline meetings. Provision of technical support to the projects and preparation of man-hour estimate. Instructed and supervised subordinates to enable them to perform their work effectively. Ensure familiarity with and implement the requirements of the Health, Safety and Environment and Quality Management System.  Monitored and contributed input on weekly progress to project management team. Witnessed FAT and performed pre/commissioning on HVAC and fire protection systems.

Service Engineer

Apr 2005 - Nov 2005 (7 months)

 Onshore Drilling Rental Services - PetroChina International Jabung Ltd - Indonesia • Managed and supervised rotational 24/7 maintenance operation of Varco top-drive drilling equipment for onshore drilling operations in the provinces of Indonesia.  Prepared daily progress report on drilling activities, diagnosing, rectifying, logging and reporting downtime incidence.  Performed spare parts inventory and requisition, ensuring proper implementation of HSEQ practices related to equipment maintenance operation within the rig site.  Supervised and ensured the scheduled related maintenance activities were carried-out accordingly.  Managed mobilization/demobilization activities including the rig-up/rig-down cycle of activities.

Senior Electrical Engineer

Dec 2002 - Apr 2005 (2 years)

 Conoco Belanak Field Devt Project-FPSO - Halliburton Far East/PTJ McDermott  TTP-PRP Project, Standby Diesel Genset - ENI/SMOE • Involved in the preparation of Engineering, Procurement, Construction & Commissioning (EPCC) of Six (6) E-House projects delivered to Conoco Philips. The work involved herein was to provide EPCC scope to deliver E-House for oil & gas onshore/offshore platforms.  Preparation of long lead electrical equipment technical specifications and data sheets, substation single line diagram, substation and equipment layout, establishment of loadlist, preliminary calculations (e.g. UPS, MV and LV cable sizing), cable schedule and main power cable routing.  Equipment sizing and selection of transformer, HV/LV switchgear, UPS, HVAC, power & control cable, lighting system (indoor/outdoor), and preparation of Technical Bid Evaluation (TBE) and carried-out report, selection of vendor.  Reviewed all electrical design and drawings prepared by engineers/designers and attended discipline meetings. Provision of technical support to the projects and preparation of man-hour estimate. Instructed and supervised subordinates to enable them to perform their work effectively. Ensure familiarity with and implement the requirements of the Health, Safety and Environment and Quality Management System.  Monitored and contributed input on weekly progress to project management team. Witnessed FAT and performed pre/commissioning on HVAC and fire protection systems. • Developed, prepared and designed E&I deliverables such as equipment layout, cable block, interconnection and schematic diagram in the customization and fabrication of 1.6MW/480V diesel generator unit for oil and gas offshore platform.

Application/Project Engineer

May 2001 - Jul 2002 (1 year)

 Conoco Belanak/Panyu 4-2/5-1 Field Devt/Ocean Baroness & Rover - Halliburton Far East/Sembawang Marine Offshore/KeFels Engineering • Attended customer technical queries, provided support and recommendation of customized UPS system sizes and configurations based on project specifications. • Processed confirm order, established order production workflow and schedule, developed and designed deliverables including equipment internal/external layout, single line and schematic diagrams, bill of materials, FAT procedure/result, and operation manual as per project order requirements. • Conducted FAT activity, arranged and expedited order delivery and close-out of project order.

Electrical Engineer

Mar 1998 - Apr 1999 (1 year)

 Trunked Mobile Radio For Refining & Distribution Upgrade - Saudi Aramco Facilities  Jeddah Musadiah Building  Jeddah Refinery  Jeddah Bulk Plant  Abqaiq Refinery  Riyadh Refinery  Riyadh Pump Station No. 4  Ras Tanura Refinery  Jubail Refinery  All other Remote Cell Sites • The work involved herein was to design and build electrical power distribution system to energize telecommunication equipment within ARAMCO premises, strictly adhering according to Saudi Aramco Engineering Standard.  Conducted site surveys on availability of existing power distribution and cabling system routing.  Performed load calculations and sizing of distribution board, distribution transformer, cable and conduit.  Developed, designed and prepared engineering deliverables including single line, cable block, interconnection diagram, conduit and cable schedule.  Conducted SAT and handed-over UPS system to owner.

E&I Design Draftsman

Sep 1995 - Sep 1997 (2 years)

 Dhahran Community Maintenance Division - Saudi Aramco • The work involved herein was to deliver engineering maintenance operation services within Dhahran community, a Saudi Aramco premises.  Conducted site surveys on existing facilities for any upgrading work order required.  Design drafting of electrical lighting & power, telecoms/data, fire protection system and street lighting drawing layouts.  Performed lighting calculation, distribution board, feeder and branch cable/protection sizing, including street lighting distribution transformer.  Discussed and coordinated with other disciplines the interfaces and practicality of all installation works.

Electrical Maintenance Supervisor

Jun 1991 - Aug 1993 (2 years)

 King Khalid Military Academy - Royal National Guard • The work involved herein was to deliver maintenance operation services within King Khalid Military Academy, a Saudi National Guard facility.  Previously working as electrical technician, but selected and designated to become the supervisor in the department.  Managed and supervised the full implementation of routine scheduled maintenance operations of all the electrical equipment according to the standard practices of the industry. Supervised routine maintenance activity for substations, standby diesel generators, street lighting, water treatment, buildings lighting & small power and kitchen/laundry equipment.  Personally involved in the diagnostic and troubleshooting activities on larger size of water heaters, pump motors, high mast lighting, various laundry and kitchen equipment and transformer oil replacement activity.  Designed, drafted and supervised the electrical construction/installation of building vacant ground floor into an office space.

Doğrulamalar

  • Facebook Bağlantılı
  • Tercih Edilen Freelancer
  • Ödeme Onaylı
  • Telefonu Doğrulanmış
  • Kimliği Doğrulanmış
  • E-postası Doğrulanmış

Benzer Freelancerlara Göz At