Profile image of bblinki
@bblinki
Flag of Serbia Beograd, Serbia
Member since 18 Ağustos 2014
0 Tavsiye

bblinki

Çevrimiçi Çevrimdışı
I am an electrical engineer. I have experience in the field of Matlab (Simulink), VBA (Excel), Industrial Engineering , Power System, control Systems, Linear Programming and Microcontroller (Arduino). I have worked on many projects, like control and regulation of the power plant and simulation and training center for power plant. I have worked as an engineer for development. I have experience in programming in VBA. I have completed several projects in VBA, Excel. I'm good in physics, thermodynamics and simulation of thermodynamic process.
$5 USD/sa
6 değerlendirme
3.4
  • 100%Tamamlanmış İş
  • 100%Bütçe Dahilinde
  • 100%Zamanında
  • 50%Tekrar İşe Alınma Oranı

Portföy

Son Değerlendirmeler

Deneyim

Engineer for turbine control

Jun 2010

I have been working on developing control system.

Eğitim

Bachelor in Electrical Engineering

2005 - 2009 (4 years)

Master of science, Electrical Engineering

2010 - 2012 (2 years)

Sertifikalar

The second award at the national competition in physics (2004)

Serbian Physical Society

I'm proud of this award.

Yayınlar

HEAT ENERGY DISTRIBUTION WITHIN BOILER PLANT AT THERMAL POWER PLANTS AND ESTIMATION OF ASH DEPOSIT ON HEATING SURFACES

The distribution of heat energy on boiler heating surfaces in a thermal power plant is one of the key factors in the efficiency of the boiler. During the exploitation ash deposit сan accumulate on heating surfaces and projected heat distribution is disturbed. Severe ash deposit on specific heating surface can result from irregular combustion in the boiler (lack of O2, distribution and quality of milling, ...). This paper describes software, based on thermodynamic calculations, that determines the distribut

INFLUENCE OF COORDINATED CONTROL OF BOILER AND TURBINE PLANT ON THERMAL POWER PLANT OPERATION WHEN THE UNIT IS OPERATING IN PRIMARY FREQUENCY CONTROL

Thermal power plant is very complex. Coordinated operation of the turbine and boiler in a power plant is required for the stable operation of the power plant. In this paper describes how coordinated operation influence on response of the plant in the primary regulation.

Sertifikalar

  • Numeracy 1
    94%

Doğrulamalar

  • Facebook Bağlantılı
  • Tercih Edilen Freelancer
  • Ödeme Onaylı
  • Telefonu Doğrulanmış
  • Kimliği Doğrulanmış
  • E-postası Doğrulanmış

Başlıca Becerilerim

Benzer Freelancerlara Göz At