EXPLORE


0.0
0.0
0%
$1 USD / Hour
・

Bangladesh (11:16 AM)
・
Joined on June 19, 2012
$1 USD / Hour
・
Graduated in Civil Engineering, Expertise in all kinds of jobs regarding MS Word, Excel, AutoCad, Etabs, StaadPro, Photoshop with Standard writing Skill within Scheduled Time.
Verifications
Beam Design
Beam Design
No reviews to see here!
Experience
Assistant Engineer
Jun, 2012 - Present
•
14 years, 1 month
Department of Public Health Engineering
Jun, 2012 - Present
•
14 years, 1 month
All kinds of Water Supply & Sanitation related Work in Bangladesh
Jun, 2012 - Present
•
14 years, 1 month
Education
B. Sc. in Civil Engineering
2004 - 2008
•
4 years

Bangladesh
2004 - 2008
•
4 years
Qualifications
Graduation Certificate
2008
RUET
4 years Graduation Certificate
2008
Publications
THE LIFE CYCLE COST ANALYSIS OF A LOW RISE R.C. BUILDING
BUET
Life cycle costs (LCC) are cradle to grave costs summarized as an economic model of evaluating alternatives for equipment and projects. It is the total cost of ownership of machinery and equipment, including its cost of acquisition, operation, maintenance, conversion, and/or decommissions [1]. It is the summations of cost estimates from inception to disposal for both equipment and projects as determined by an analytical study and estimate of total costs experienced in annual time increments during the proje
THE EFFECT OF FINE CONTENT ON DENSITY AND BULKING CHARACTERISTICS OF DREDGED FILL SOIL
RUET
Hydraulic filling is used through out the world for the construction of artificial island, water retention dams, mine tailing impoundments, backfill of the underground mines, disposal of dredged soils and the reclamation of land. Deposition of hydraulic fill is analogous to the genesis of a soil deposit. The difference between a natural and a hydraulically fill clay deposit is a matter of age (Schiffman et al, 1988). In case of hydraulic filling, the fill material is pumped through pipe lines onto the const