EXPLORE

Concept Design Construction Monitoring Electrical Engineering Engineering PLC & SCADA
Profile cover photo
User Avatar

Sanjeev K.

@sanjeevksaini

0.0
0

0.0

0.0

0%

ICS (DCS / ESD) System Design

$50 USD / Hour

Flag of

India (4:57 AM)

Joined on June 13, 2006

$50 USD / Hour

Possess extensive experience of 21+ years (Oversea 14+ Years) in the field of Industrial Automation & Control System (IACS) Engineering professional with Samsung Engineering, Emerson India, Sofcon System (Rockwell Automation). Dexterous in Software / Hardware of ICS/PCS system for Power Plant / Gas projects / ECMS; for Samsung Engineering (SECL), Saudi Aramco (Saudi), ADNOC (Abu Dhabi), Ras Girtas Power Company (RGPC - Qatar), Kahramaa, Hyundai (Qatar), National Thermal Power Corporation (NTPC), Hindustan Zinc Ltd., IOCL Possess expertise and experience in Front End Engineering Design (Feed), Basic & Detailed Engineering, System Architecture preparation included OT Cyber Security, Inter-discipline interface, P&ID comprehension, Scope Split identification, General design criteria, ITB review and summary skills, Job instruction preparation, TQ clarification, Proposal competency, Floating RFQ / MR, Performing TBE, Vendor selection, TBE report submission, Vendor print review. Designed & implemented circuits (System Architecture) and systems used for computer based, communication and control systems, and other industrial applications such as CCPP / Process Control Industries included different communication technics (Wired / Communication Fiber optics) Designed software (Logic / Closed Loop), especially embedded software, to be used within such systems & developing procedures to test Control system hardware / software components, circuits and systems Experienced in developing Effective and Efficient Control strategy in the field of Engineering, Designing, Commissioning of Combined Cycle Power Plant, Thermal Power Plant, BOP, HRSG, Boiler and there seamless integration with GTG, STG, Industrial Instrumentation & automation System, Electrical Control & Monitoring System (ECMS), Generator synchronization system. Hands on experience (Software / hardware) on different DCS / ICS system as Emerson Ovation Control System, ABB S+, Allen Bradley, system for implementing Control loop / logic for BOP, HRSG, Boiler, GTG & STG, ECMS and Graphic building development; testing (Pre-Factory Acceptance Test (FAT) / FAT/ Site Acceptance Test (SAT) / Performance Acceptance Test (PAT), construction & commissioning. Developed engineering schedule; reconciled Bill of Material variation & technically leading BOM variation settlement. Managed technical agreements throughout project cycle. Reviewed DCS Software / Hardware / Graphics loops & logic VP’s review for package system; developed required integrated control philosophy considering ICS configuration, communication mapping & Functional Design Specification.

Reviews
0 Reviews

No reviews to see here!

Experience

Samsung Engineering Co. Ltd

Dec, 2011 - Apr, 2025

13 years, 3 months

Lead System Engineer

Jan, 2020 - Apr, 2025

5 years, 2 months

Responsible for Waste Heat Recovery Project (WHRP – ADNOC), Saudi Aramco Co-Generation (Cogen) project throughout project cycle (Proposal, Basic engineering, Vendor selection, detail engineering, construction, commissioning, Reliability test. Responsible for co-ordination with different engineering team, Development of ICS System Architecture included cyber security, Technical Bid Evaluation (TBE), Detail Design, FAT, IFAT, SIT, Functional Test, C&E Verification, SAT, ISAT

Flag of

Ruwais, United Arab Emirates

ICS System Design Engineer

Aug, 2018 - Jan, 2020

1 year, 5 months

Prepared RFQ in compliance with applicable standard for IACS / ICS / PCS, ESD, DCS, SWAS, CEMS / PMES) Prepared different design concept applicable to project requirement, got approval from COMPANY. Developed detail engineering deliverable, update relevant drawing / connection. Co-ordinated any applicable change to another discipline (Mainly Electrical) to incorporated any impact on their deliverable. Prepared Technical Bid Evaluation (TBE), Cable schedule / Termination, cable schedule.

Flag of

Seoul, Korea, Democratic People's Republic of

Lead System Engineer

Nov, 2015 - Aug, 2018

2 years, 9 months

Developed Effective and Efficient Control strategy in the field of Engineering, Designing, Commissioning of Combined Cycle Power Plant, Thermal Power Plant, BOP, HRSG, Boiler and there seamless integration with GTG, STG, Industrial Instruments Designed & implemented circuits (System Architecture) and systems used for computer based, communication and control systems, and other industrial applications such as CCPP / Process Control Industries included different communication technics

Flag of

Dammam, Saudi Arabia

Senior ICS Design Engineer

Jun, 2013 - Oct, 2015

2 years, 4 months

Front End Engineering Design (Feed), Basic & Detailed Engineering, System Architecture preparation included OT Cyber Security, Inter-discipline interface, P&ID comprehension, Scope Split identification, General design criteria, ITB review and summary skills, Job instruction preparation, TQ clarification, Proposal competency, Floating RFQ / MR, Performing TBE, Vendor selection, TBE report submission, Vendor print review.

Flag of

Seoul, Korea, Democratic People's Republic of

Senior Engineer

Dec, 2011 - Jun, 2013

1 year, 5 months

Prepared Technical Bid Evaluation (TBE), Technical bid clarification, Cable schedule / Termination, cable schedule Participated in design review meetings, 3-D Model review, P&ID’s review, Co-ordination with Owner, HAZOP Study, SIL report at different stage of engineering as Instrument. Prepared Cable interconnection Diagram, Plant I&C configuration drawing, Package system interface, DCS I/O List

Flag of

Noida, India

Dec, 2011 - Apr, 2025

13 years, 3 months

Deputy Manager

Oct, 2007 - Dec, 2011

4 years, 2 months

Emerson Process Manangment

Oct, 2007 - Dec, 2011

4 years, 2 months

ICS / PCS Software development for control closed loop / logic design from write up & control philosophy for power plant automation, mechanical different packages, water treatment system & Electrical control automation projects (ECMS). Leading team during FAT, SAT & Commissioning effort for Thermal / Combined cycle Power Projects. Preparation Power plant Software Automation project Specification, System Architecture, IO list, Control logic design & testing, database, log report configuration

Flag of

Noida, India

Oct, 2007 - Dec, 2011

4 years, 2 months

Project Engineer

Aug, 2002 - Sep, 2007

5 years, 1 month

Sofcon System India Pvt. Ltd

Aug, 2002 - Sep, 2007

5 years, 1 month

Software / Hardware integration, Logic/graphics implementation for site commissioning with different platform of Allen-Bradley Control Systems (DCS), SLC, PLC, Control Logix, Flexlogix, Micrologix Different type of meters such as Enercon, Rishab, Allen-Bradley Power monitors, Line Synchronization Module etc. It includes auto start/stop up of generator, Synchronization with Grid, Load Sharing & Shading as per grid available.

Flag of

Noida, India

Aug, 2002 - Sep, 2007

5 years, 1 month

Education

10th

1997 - 1997

Flag of

India

1997 - 1997

Qualifications

Associate Certification

2023

Simplilearn

Cyber Security Diploma

2023

Post Gradution

2013

Symbiosis Institute

Post Graduation in Finance

2013

Graduation

2009

Associated Memeber of Engineering (AMIE)

Graduation in Electrical Engineering

2009

Verifications

Registered Users

Total Jobs Posted

Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)

Copyright © 2026 Freelancer Technology Pty Limited (ACN 142 189 759)