Journal Report - Mechanical Engineer Needed

İptal Edildi İlan edilme: Apr 2, 2015 Teslim sırasında ödenir
İptal Edildi Teslim sırasında ödenir

Hello,

I Need Journal Report. Risk Based Maintenance on Marine Machinery System. 

The system will be Fuel Oil System. Derived a maintenance plan and use RBM techniques onto Fuel Oil System.

Format as follows:

Abstract

Introduction

Methodology

Results

Discussion

REFERENCE

This will be a Risk Based Maintenance on Marine Engine -Fuel Oil System. so i would like to see how can i apply the Risk Based Maintenance onto the Fuel Oil System of a Marine Engine - either 2 Stroke or 4 Stroke Engine .

Please bid if you are qualified for this job, so we can discuss the price and deadline.

Thank you

Mühendislik Matlab ve Mathematica Makine Mühendisliği Rapor Yazma Risk Yönetimi

Proje NO: #7416010

Proje hakkında

4 teklif Uzak proje Aktif Apr 18, 2015

Bu iş için 4 freelancer ortalamada $28 teklif veriyor

bompolaris

hi,sir. I am impressed when saw your post. i have experience on the field. my skill is Academic writing,C,C++,Excel,web scraping,data mining,website development,reversing,mathematics,engineering,algorithm.... i can Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(2 Değerlendirme)
2.1
lramanathan

1. I am a certified Project Risk manager 2.I have done various risk management exercises 3. I have used various tools during risk management 4. I am passionate about Risk based maintanence.

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(1 Yorum)
1.9
$30 USD in 5 gün içinde
(5 Değerlendirme)
1.6
MoohAmMmed

hi sir , first iam an civil engineering and studied mechanical also iam a professional writer and translator , i can do it so easy all u have to do is to chat me thank u sir

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(2 Değerlendirme)
1.1
emma0

Dear I have reviewed your project requirements and am ready to assist. Am offering the best quality available services according to your budget. I have over 5 years of Research experience and project writing, within Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0
satya1dohare

Management Responsibility:  Planning of Preventive maintenance Planner for drilling and work over equipments based in OEM recommendations.  Planned, Predictive, Breakdown, Preventive Maintenance to Increase efficie Daha Fazla

1 gün içinde %bids___i_sum_sub_32%%project_currencyDetails_sign_sub_33% USD
(0 Değerlendirme)
0.0