Planning road construction inside factory premises. Close to 2500 sq. mtr of concrete road and approx. 2000 sq. mtr of paver block road. Need a civil engineer for overlooking the work. Around 2 to 3 months of work.
Proje No: 15700549

Proje hakkında

5 teklif
Uzaktan proje
Son aktiviteden bu yana geçen zaman 6 yıl önce

Biraz para mı kazanmak istiyorsunuz?

Freelancer'da teklif vermenin faydaları

Bütçenizi ve zaman çerçevenizi belirleyin
Çalışmanız için ödeme alın
Teklifinizin ana hatlarını belirleyin
Kaydolmak ve işlere teklif vermek ücretsizdir
5 freelancer bu proje için ortalama ₹59.944 INR teklif veriyor
Kullanıcı Avatarı
Hi, I am Vincent, a civil engineer by profession. I can help you with the assignment. Kindly allow me to discuss the project with you. Regards Relevant Skills and Experience Civil engineer Proposed Milestones ₹83333 INR - NEGOTIABLE
₹83.333 INR 3 gün içinde
5,0 (13 değerlendirme)
3,9
3,9
Kullanıcı Avatarı
A proposal has not yet been provided
₹41.666 INR 10 gün içinde
0,0 (0 değerlendirme)
0,0
0,0
Kullanıcı Avatarı
A proposal has not yet been provided
₹62.222 INR 100 gün içinde
0,0 (0 değerlendirme)
0,0
0,0
Kullanıcı Avatarı
I was working with the Department of Public Works and Highways in our country as project engineer in various projects, roads, drainage, shore protection, school buildings, multi-purpose building, bridges..etc., my short construction methodology are as follows; 1. A survey should be conducted to be precise of the project limits and contours. 2. Layout will be conducted in preparation for the sub-base and base coarse aggregates, any downgrade area should be filled to attain the specifications of the design. 3. After all cuts and fills are accomplished, a sub-grade aggregates will be spread on the area to be cemented, in which a compaction will be conducted to attain a 95% to 100% compaction. 4. After the compaction of the sub-grade is attained, a base coarse aggregates will be spread, depending on the specified thickness, and compaction will be conducted to attain the 95% to 100% compaction. 5, A field density test will be conducted, to assure the base aggregates are fully compacted and are ready for concrete pouring, this will depend on the design of the concrete and thickness. 6. A mock-up will be conducted in the project area, and a concrete cylinder will be made for compression test on specified number of days. 7. If the concrete requires for a reinforcing bars, a design will be submitted with the bar sizes. But with the construction joints, it is required to install reinforcing bars to connect the concrete with maximum adhesiveness.
₹62.500 INR 20 gün içinde
0,0 (0 değerlendirme)
0,0
0,0

Müşteri hakkında

   INDIA bayrağı
India
0,0
0
Kas 22, 2017 tarihinden bu yana üye

Müşteri Doğrulaması

Teşekkürler! Ücretsiz kredinizi talep etmeniz için size bir bağlantı gönderdik.
E-postanız gönderilirken bir şeyler yanlış gitti. Lütfen tekrar deneyin.
Kayıtlı Kullanıcı İlan Edlien Toplam İş
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Ön izleme yükleniyor
Coğrafik konum için izin verildi.
Giriş oturumunuzun süresi doldu ve çıkış yaptınız. Lütfen tekrar giriş yapın.